000 01780cam a2200337 a 4500
003 EG-GiCUC
005 20250223030938.0
008 140303s2013 ua dhb f m 000 0 eng d
040 _aEG-GiCUC
_beng
_cEG-GiCUC
041 0 _aeng
049 _aDeposite
097 _aM.Sc
099 _aCai01.13.05.M.Sc.2013.Ma.E
100 0 _aMagdy Sayed Ahmed
245 1 4 _aThe effect of proposed upper Nile projects on the hydraulic performance of the white Nile and Jabel Aulia Dam operation rules /
_cMagdy Sayed Ahmed ; Supervised Alaa Eldin Mohamed Elzawahry , Ashraf Saad Zaghloul
246 1 5 _aدراسة تاثير مشروعات اعالى النيل لزيادة ايراد النهر على الاداء الهيدروليكى للنيل الابيض وقواعد تشغيل خزان جبل الاولياء
260 _aCairo :
_bMagdy Sayed Ahmed ,
_c2013
300 _a114, (26) P. :
_bcharts , facsimiles , maps ;
_c30cm
502 _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 _aThe Nile river flows into Sudan and passes through sudd region the great wetlands which are the main sources of losses . There are three mega projects in upper Nile region to increase the yield of River Nile . The filow of White Nile will increase creating new stagnation zones interfere with recent operation rules of Jebel Aulia Dam
530 _aIssued also as CD
653 4 _aAgriculture development projects
653 4 _aJabel aulia dam
653 4 _aWhite Nile
700 0 _aAlaa Eldin Mohamed Elzawahry ,
_eSupervisor
700 0 _aAshraf Saad Zaghloul ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aNazla
_eRevisor
905 _aSoheir
_eCataloger
942 _2ddc
_cTH
999 _c45240
_d45240