000 | 01978cam a2200313 a 4500 | ||
---|---|---|---|
003 | EG-GiCUC | ||
008 | 150217s2014 ua f m 000 0 eng d | ||
040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
041 | 0 | _aeng | |
049 | _aDeposite | ||
097 | _aPh.D | ||
099 | _aCai01.18.02.Ph.D.2014.Ha.N | ||
100 | 0 | _aHamed Mahmoud Elsayed Mahmoud | |
245 | 1 | 2 |
_aA novel approach for fuzzy multi-criteria decision making / _cHamed Mahmoud Elsayed Mahmoud ; Supervised Hesham Ahmed Hefny , Hisham Fouad Aly |
246 | 1 | 5 | _aأسلوب مبتكر {uئإئ٩}تخاذ القرار الفازى متعدد المعايير |
260 |
_aCairo : _bHamed Mahmoud Elsayed Mahmoud , _c2014 |
||
300 |
_a135 Leaves ; _c30cm |
||
502 | _aThesis (Ph.D.) - Cairo University - Institute of Statistical Studies and Research - Department of Computer and Information Science | ||
520 | _aThis thesis proposes an improved fuzzy multi criteria decision making (FMCDM) model called: Gaussian fuzzy ANP (GFANP). The proposed GFANP overcomes the ranking problem of the classical FANP by introducing novel scenario for switching between TFNs and their approximated gaussian fuzzy numbers (GFNs) in the ranking stage, while returning back to TFNs when performing arithmetic operations during the preparation of evaluation matrices. Accordingly, the proposed GFANP model does not allow the appearance of zero values in the ranking vector of the considered alternatives. The proposed GFANP is evaluated by field experts in the domain of electric power generation, where we use our proposed model to select the best scenario for generating electric power in Egypt for the next decade based on both risk and cost | ||
530 | _aIssued also as CD | ||
653 | 4 | _aANP | |
653 | 4 | _aElectric power generation | |
653 | 4 | _aFuzzy | |
700 | 0 |
_aHesham Ahmed Hefny , _eSupervisor |
|
700 | 0 |
_aHisham Fouad Aly , _eSupervisor |
|
905 |
_aNazla _eRevisor |
||
905 |
_aSamia _eCataloger |
||
942 |
_2ddc _cTH |
||
999 |
_c49438 _d49438 |