000 02140cam a2200337 a 4500
003 EG-GiCUC
005 20250223031205.0
008 150330s2014 ua dhb f m 000 0 eng d
040 _aEG-GiCUC
_beng
_cEG-GiCUC
041 0 _aeng
049 _aDeposite
097 _aM.Sc
099 _aCai01.13.05.M.Sc.2014.Ra.S
100 0 _aRajaa Mohammed Sabri
245 1 0 _aSimulation of sediment transport in high Aswan Dam Lake /
_cRajaa Mohammed Sabri ; Supervised Mohamed S. El-Manadely , Mohamed H. El-Gamal
246 1 5 _aمحاكاة حركة المواد الرسوبية في بحيرة السد العالي
260 _aCairo :
_bRajaa Mohammed Sabri ,
_c2014
300 _a92 P. :
_bcharts , facsimiles , maps ;
_c30cm
502 _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 _aHigh Aswan Dam is the most important construction on the Nile River for water storage and control. The dam experiences sedimentation problem upstream the lake. The rate of reservoir sedimentation depends mainly on the size of a reservoir relative to the amount of sediment flowing into it. Through this study, a number of scenarios has been tested to numerically study the expected morphological changes that might take place in HADL as a result of the possible reduction of the incoming flow and/ or the sediment loads due to any possible dam construction activities upstream. The mathematical model was first verified to represent the conditions of the lake second; the model was evaluated then applied to the developed scenarios to predict the sediment transport in the longitudinal direction and sedimentation zone extension along the lake and to estimate of the expected total sediment volume
530 _aIssued also as CD
653 4 _aGSTARS3
653 4 _aHigh Aswan Dam Lake
653 4 _aSediment transport
700 0 _aMohamed Hassan Elgamal ,
_eSupervisor
700 0 _aMohamed Sheref Elmanadely ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aNazla
_eRevisor
905 _aSoheir
_eCataloger
942 _2ddc
_cTH
999 _c50142
_d50142