000 | 02643cam a2200337 a 4500 | ||
---|---|---|---|
003 | EG-GiCUC | ||
005 | 20250223031450.0 | ||
008 | 160405s2015 ua dh f m 000 0 eng d | ||
040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
041 | 0 | _aeng | |
049 | _aDeposite | ||
097 | _aM.Sc | ||
099 | _aCai01.13.05.M.Sc.2015.Mo.D | ||
100 | 0 | _aMohamed Magdy Abdallah Elzbdany | |
245 | 1 | 0 |
_aDeveloping of a computer-based model for applying the price adjustment formula in construction projects in Egypt / _cMohamed Magdy Abdallah Elzbdany ; Supervised Moheeb Elsaid Ibrahim , Ahmed Mohamed Eldokhmasey |
246 | 1 | 5 | _a تطوير نموذج حاسوبي لتطبيق معادلة تغيير الأسعار في مشروعات التشييد في جمهورية مصر العربية |
260 |
_aCairo : _bMohamed Magdy Abdallah Elzbdany , _c2015 |
||
300 |
_a144 P. : _bcharts , facsimiles ; _c30cm |
||
502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering | ||
520 | _aVolatile price of the projects items throughout the implementation phase is considered a major problem facing construction projects all over the world. Such problem arises so often and leads in most cases to arising claims. Prices variation can arise due to various economic, political and natural reasons. Inflation is considered the most obvious phenomena in the case of price variation; therefore, the biggest problem is the volatility of prices throughout the work course whose impact is required to be avoided during the implementation phase. The research also addresses the means of dealing with the price variation according to the different types of general terms and conditions of the international contracts. The research presents the definition of computer models and its various applications in construction. The research introduces a computer-based model titled as CP_PAS designed specially to adjust the price of contract. The introduced system is general and can be used by all parties of projects to estimate the adjustment of prices, as it is considered an instrument to provide the contract with flexibility to adapt the market price changes and upon agreement between parties as per the pre-determined terms and conditions | ||
530 | _aIssued also as CD | ||
653 | 4 | _aBased Model | |
653 | 4 | _aComputer | |
653 | 4 | _aPrice Adjustment | |
700 | 0 |
_aAhmed Mohamed Eldokhmasey , _eSupervisor |
|
700 | 0 |
_aMoheeb Elsaid Ibrahim , _eSupervisor |
|
856 | _uhttp://172.23.153.220/th.pdf | ||
905 |
_aNazla _eRevisor |
||
905 |
_aSoheir _eCataloger |
||
942 |
_2ddc _cTH |
||
999 |
_c55860 _d55860 |