000 02062cam a2200325 a 4500
003 EG-GiCUC
005 20250223031716.0
008 170411s2016 ua o f m 000 0 eng d
040 _aEG-GiCUC
_beng
_cEG-GiCUC
041 0 _aeng
049 _aDeposite
097 _aM.Sc
099 _aCai01.13.12.M.Sc.2016.Mo.A
100 0 _aMohamed Ahmed Abdelsadik Ali Sallam
245 1 0 _aAnalysis of multi-layered commingled and compartmentalized gas reservoirs /
_cMohmed Ahmed Abdelsadik Ali Sallam ; Supervised Ahmed Hamdi Elbanbi
246 1 5 _aتحليل مكامن الغاز المجزئة و الموزعة على عده طبقات
260 _aCairo :
_bMohmed Ahmed Abdelsadik Ali Sallam ,
_c2016
300 _a107 P. :
_bphotographs ;
_c30cm
502 _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Metallurgical Engineering
520 _aAssessment of gas reserves in multi-layered commingled and compartmentalized reservoirs depends mainly on proper allocation of gas production either directly through the wells or indirectly between through communicating tanks. This task is a cumbersome and in most cases will lead to inconclusive results especially with minimal pressure and rate data for every layer. The main objective of this research is to present a simple analytical tool which can adapt with these conditions and provide a reliable estimate of original gas in place and production allocation. This was achieved by coupling of Layer Stabilized Flow Model (LSFM) for commingled system with communicating reservoir model (CR) for compartmented reservoirs. The model was verified and applied against several simulation and field cases
530 _aIssued also as CD
653 4 _aAnalytical model
653 4 _aCommingled and compartmentalized gas reservoirs
653 4 _aProduction allocation-material balance equation
700 0 _aAhmed Hamdi Elbanbi ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aNazla
_eRevisor
905 _aSamia
_eCataloger
942 _2ddc
_cTH
999 _c60654
_d60654