000 | 01864cam a2200313 a 4500 | ||
---|---|---|---|
003 | EG-GiCUC | ||
008 | 180212s2017 ua d f m 000 0 eng d | ||
040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
041 | 0 | _aeng | |
049 | _aDeposite | ||
097 | _aM.Sc | ||
099 | _aCai01.13.05.M.Sc.2017.No.O | ||
100 | 0 | _aNourhan Abdelazim Mahmoud Mohamed | |
245 | 1 | 3 |
_aAn optimization operational model of the grand ethiopian renaissance dam / _cNourhan Abdelazim Mahmoud Mohamed ; Supervised Mohamed Nasr Eldin Allam , Hesham Bekhit Mohamed |
246 | 1 | 5 | _aنموذج أمثل لتشغيل سد النهضة الإثيوبي |
260 |
_aCairo : _bNourhan Abdelazim Mahmoud Mohamed , _c2017 |
||
300 |
_a87 P. : _bcharts ; _c30cm |
||
502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering | ||
520 | _aThis thesis builds up a nonlinear optimization model to asses the Grand Ethiopian Renaissance Dam (GERD)impacts under different scenarios of operation and storage capacity. Theproposed model succeeded to deal with the Blue Nile flow high irregularity nature. Beside, the complexnonlinearity addressed by the configuration of GERD. The results emphasized the irrecoverable severe negative impacts of GERD on Egypt during the long-term operationand not only the initial filling phase, as claimed. Decreasing GERD storage capacity shows a potential of mitigating its downstream impacts along with a relatively high hydropower production | ||
530 | _aIssued also as CD | ||
653 | 4 | _aGrand Ethiopian Renaissance Dam Operation | |
653 | 4 | _aLingo Nonlinear Optimization | |
653 | 4 | _aWater Resources Management Modeling | |
700 | 0 |
_aHesham Bekhit Mohamed , _eSupervisor |
|
700 | 0 |
_aMohamed Nasr Eldin Allam , _eSupervisor |
|
905 |
_aNazla _eRevisor |
||
905 |
_aShimaa _eCataloger |
||
942 |
_2ddc _cTH |
||
999 |
_c64961 _d64961 |