000 01864cam a2200313 a 4500
003 EG-GiCUC
008 180212s2017 ua d f m 000 0 eng d
040 _aEG-GiCUC
_beng
_cEG-GiCUC
041 0 _aeng
049 _aDeposite
097 _aM.Sc
099 _aCai01.13.05.M.Sc.2017.No.O
100 0 _aNourhan Abdelazim Mahmoud Mohamed
245 1 3 _aAn optimization operational model of the grand ethiopian renaissance dam /
_cNourhan Abdelazim Mahmoud Mohamed ; Supervised Mohamed Nasr Eldin Allam , Hesham Bekhit Mohamed
246 1 5 _aنموذج أمثل لتشغيل سد النهضة الإثيوبي
260 _aCairo :
_bNourhan Abdelazim Mahmoud Mohamed ,
_c2017
300 _a87 P. :
_bcharts ;
_c30cm
502 _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 _aThis thesis builds up a nonlinear optimization model to asses the Grand Ethiopian Renaissance Dam (GERD)impacts under different scenarios of operation and storage capacity. Theproposed model succeeded to deal with the Blue Nile flow high irregularity nature. Beside, the complexnonlinearity addressed by the configuration of GERD. The results emphasized the irrecoverable severe negative impacts of GERD on Egypt during the long-term operationand not only the initial filling phase, as claimed. Decreasing GERD storage capacity shows a potential of mitigating its downstream impacts along with a relatively high hydropower production
530 _aIssued also as CD
653 4 _aGrand Ethiopian Renaissance Dam Operation
653 4 _aLingo Nonlinear Optimization
653 4 _aWater Resources Management Modeling
700 0 _aHesham Bekhit Mohamed ,
_eSupervisor
700 0 _aMohamed Nasr Eldin Allam ,
_eSupervisor
905 _aNazla
_eRevisor
905 _aShimaa
_eCataloger
942 _2ddc
_cTH
999 _c64961
_d64961