245 1 0 _aCritical factors effecting on delay time in residential construction projects /
_cDalia Ahmed Elbadawy Mahmoud Kshaf ; Supervised Moheeb Elsaid Ibrahim , Saeed Ahmed Alsheikh
246 1 5 _aالعوامل الحرجة التي تؤثر على التأخير في المشاريع السكنية
260 _aCairo :
_bDalia Ahmed Elbadawy Mahmoud Kshaf ,
_c2018
300 _a93 P. :
_bcharts ;
_c30cm
502 _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 _aTime is considered one of the most powerful factors that leads to the success of any projects, sometimes leads to legal disputes between parties. Therefore, it is essential to study and analyze causes of construction delay to determine the party which is responsible for the delay or if the reasons are beyond the control of any of the parties.This research presents a list of the most important construction delay causes according to interviews. Statistical analysis is carried out using analysis of variance (Kruskal-wallis) method to test delay causes, obtained from interviews. In the end a road map that includes the reasons for the delay, according to their importance and proposals of the parties ( The owner {u2013} The contractor {u2013} The consultant ) were made to avoid delays in the project , or at least to reduce them
530 _aIssued also as CD
653 4 _aAnalyze
653 4 _aConstruction delays
653 4 _aInterview
700 0 _aMoheeb Elsaid Ibrahim ,
_eSupervisor
700 0 _aSaeed Ahmed Alsheikh ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aEnas
_eCataloger
905 _aNazla
_eRevisor
942 _2ddc
_cTH
999 _c67177
_d67177