000 | 01634cam a2200337 a 4500 | ||
---|---|---|---|
003 | EG-GiCUC | ||
005 | 20250223032123.0 | ||
008 | 181126s2018 ua dh f m 000 0 eng d | ||
040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
041 | 0 | _aeng | |
049 | _aDeposite | ||
097 | _aM.Sc | ||
099 | _aCai01.13.12.M.Sc.2018.Mo.P | ||
100 | 0 | _aMohamed Elsaeed Mohamed Elhasanen | |
245 | 1 | 0 |
_aPermeability estimation while dynamic underbalanced drilling / _cMohamed Elsaeed Mohamed Elhasanen ; Supervised Abdelsattar A. Dahab , Abdulaziz M. Abdulaziz |
246 | 1 | 5 | _aتقدير النفاذية أثناء الحفر تحت مستوي التوازن الديناميكي |
260 |
_aCairo : _bMohamed Elsaeed Mohamed Elhasanen , _c2018 |
||
300 |
_a89 P. : _bcharts , facsimiles ; _c30cm |
||
502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Metallurgical Engineering | ||
520 | _aThe permeability of the reservoir rocks is an important parameter in the well development as it controls the strategies of completion and production. Different methods are used to estimate the formation permeability. In the present research, The drilling parameters are used to detect formation permeability while dynamic underbalanced drilling | ||
530 | _aIssued also as CD | ||
653 | 4 | _aDynamic Underbalanced Drilling | |
653 | 4 | _aPermeability | |
653 | 4 | _aReservoir | |
700 | 0 |
_aAbdelsattar A. Dahab , _eSupervisor |
|
700 | 0 |
_aAbdulaziz M. Abdulaziz , _eSupervisor |
|
856 | _uhttp://172.23.153.220/th.pdf | ||
905 |
_aNazla _eRevisor |
||
905 |
_aShimaa _eCataloger |
||
942 |
_2ddc _cTH |
||
999 |
_c68765 _d68765 |