000 020250000a22003250004500
003 EG-GICUC
005 20250223032234.0
008 061016s2005 ua a f m 000 0 eng d
040 _aEG-GICUC
_beng
_cEG-GICUC
041 0 _aEng
049 _aDeposite
097 _aM.Sc
099 _aCai01.13.02.M.Sc.2005.Ah.E.
100 0 _aAhmed Mohammed Mahmoud Eweda
245 1 0 _aEffect of contemporary building techniques and new materials upon time , quality and cost of building construction /
_cAhmed Mohammed Mahmoud Eweda ; Supervised Mohammed Medhat Dorra , Medhat Abd El Meguid ElShazli
246 1 5 _aتاثير نظم البناء المعاصرة و المواد الحديثة على سرعة و جودة و تكلفة تنفيذ المباني
260 _aCairo :
_bAhmed Mohammed Mahmoud Eweda ,
_c2005
300 _a248P :
_bill ;
_c30cm
502 _aThesis (M.Sc.) - Cairo University - Faculty Of Engineering - Department Of Architectural Engineering
520 _aBuilding industry , which is about 12in hundred of the total industry in such a country , is not fully mechanized because it did not follow the building industrial techniquesThree main factors are greatly affected by the new building materials and techniques , time cost and qualityThese three factors are controlling and judging success and failure of technologyStudying building techniques and new materials in relation to time cost and quality is the main concern of the studyThree main factors are greatly affected by the new building materials and techniques , time , cost and qualityThose three factors are controlling and judging success and failure of construction industry
530 _aIssued also as CD
653 4 _abuilding industrial techniques
653 4 _aBuilding industry
700 0 _aMedhat Abd El Meguid ElShazli ,
_eSupervisor
700 0 _aMohammed Medhat Dorra ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aAmira
_eCataloger
905 _aEsam
_eRevisor
942 _2ddc
_cTH
999 _c71111
_d71111