000 | 02133cam a2200337 a 4500 | ||
---|---|---|---|
003 | EG-GiCUC | ||
005 | 20250223032312.0 | ||
008 | 190612s2018 ua dho f m 000 0 eng d | ||
040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
041 | 0 | _aeng | |
049 | _aDeposite | ||
097 | _aM.Sc | ||
099 | _aCai01.13.12.M.Sc.2018.Ho.R | ||
100 | 0 | _aHoda Saber Hafez | |
245 | 1 | 0 |
_aRisk assessment of grounding system in electrical substation case study : _bAbo zaable substation 66 kv / _cHoda Saber Hafez ; Supervised Fouad Khalaf , Ahdab Elmorshedy |
246 | 1 | 5 | _aتحد{u٠٦أأ}د و تق{u٠٦أأ}{u٠٦أأ}م المخاطر لنظام التأر{u٠٦أأ}ض فى محطات المحولات بالشبكة الكھرب{u٠٦أأ}ة |
260 |
_aCairo : _bHoda Saber Hafez , _c2018 |
||
300 |
_a78 P. : _bcharts , facsimiles , photographs ; _c30cm |
||
502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Metalurgical Engineering (Risk Engineering) | ||
520 | _aGrounding system in electrical substation is a main protection in power plant system that protects workers and equipment against lightning, overvoltage, switching and safe the operation continuity. So the design of the grounding system must be according to standard code IEEE 80 and it must be maintenance, test periodically. This research introduces risk assessment on the hazard that causes failure of grounding system. Preliminary risk assessment model (PRA) is used to identify, determine and show risks in grounding system to indicate the suitable control case. The 5-Step Process of Risk Management is also used to identify system hazards, before conducting the analysis of probabilities, severities and rank risk. So PHA gives preventive and protective values for unacceptable risks | ||
530 | _aIssued also as CD | ||
653 | 4 | _aGrounding system | |
653 | 4 | _aPRA model | |
653 | 4 | _aRisk assessment | |
700 | 0 |
_aAhdab Elmorshedy , _eSupervisor |
|
700 | 0 |
_aFouad Khalaf , _eSupervisor |
|
856 | _uhttp://172.23.153.220/th.pdf | ||
905 |
_aAsmaa _eCataloger |
||
905 |
_aNazla _eRevisor |
||
942 |
_2ddc _cTH |
||
999 |
_c72338 _d72338 |