100 0 _aHoda Saber Hafez
245 1 0 _aRisk assessment of grounding system in electrical substation case study :
_bAbo zaable substation 66 kv /
_cHoda Saber Hafez ; Supervised Fouad Khalaf , Ahdab Elmorshedy
246 1 5 _aتحد{u٠٦أأ}د و تق{u٠٦أأ}{u٠٦أأ}م المخاطر لنظام التأر{u٠٦أأ}ض فى محطات المحولات بالشبكة الكھرب{u٠٦أأ}ة
260 _aCairo :
_bHoda Saber Hafez ,
_c2018
300 _a78 P. :
_bcharts , facsimiles , photographs ;
_c30cm
502 _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Metalurgical Engineering (Risk Engineering)
520 _aGrounding system in electrical substation is a main protection in power plant system that protects workers and equipment against lightning, overvoltage, switching and safe the operation continuity. So the design of the grounding system must be according to standard code IEEE 80 and it must be maintenance, test periodically. This research introduces risk assessment on the hazard that causes failure of grounding system. Preliminary risk assessment model (PRA) is used to identify, determine and show risks in grounding system to indicate the suitable control case. The 5-Step Process of Risk Management is also used to identify system hazards, before conducting the analysis of probabilities, severities and rank risk. So PHA gives preventive and protective values for unacceptable risks
530 _aIssued also as CD
653 4 _aGrounding system
653 4 _aPRA model
653 4 _aRisk assessment
700 0 _aAhdab Elmorshedy ,
_eSupervisor
700 0 _aFouad Khalaf ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf