000 | 02378cam a2200313 a 4500 | ||
---|---|---|---|
003 | EG-GiCUC | ||
008 | 201007s2020 ua d f m 000 0 eng d | ||
040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
041 | 0 | _aeng | |
049 | _aDeposite | ||
097 | _aPh.D | ||
099 | _aCai01.13.05.Ph.D.2020.Mo.W | ||
100 | 0 | _aMohamed Elsayed Mohamed Mostafa Younis | |
245 | 1 | 2 |
_aA web-based application to measure the integrated project delivery and Associated risk reduction in Construction projects in egypt / _cMohamed Elsayed Mohamed Moustafa Younis ; Supervised Moheeb Elsaid Ibrahim , Ahmed Mohamed Eldokhmasey |
246 | 1 | 5 | _aتطبيق شبكى لقياس درجة النظام التكاملى لتسليم المشروعات وعلاقته بتقليل المخاطر فى مشروعات التشييد فى مصر |
260 |
_aCairo : _bMohamed Elsayed Mohamed Mostafa Younis , _c2020 |
||
300 |
_a177 , (50) P. : _bcharts ; _c25cm |
||
502 | _aThesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Civil Engineering | ||
520 | _aThis research investigated Integrated Project Delivery system IPD and its twelve key principles. A list of eight risk groups consisting of 57 individual risks was developed to measure the effect of using IPD on risk reduction. Under assumption of applying the IPD, the statistical analysis revealed significant anticipated risk reduction was noted for 2Design3 and 2Management3 risks, moderate reduction was recorded for 2Construction3 and 2Contractual3 risk groups, while slight reduction was found for the 2Economic3 and 2Political3 risk groups. A web-based application system was developed named 2IPD- Risk Assessor3 to be as a tool measuring the degree of integration of any construction project based on its contractual terms and conditions. It can calculate the anticipated risk reduction of any construction project. It can calculate the monetary values of construction risks allowances to be used in budget purposes and cost of lost opportunity corresponding to missing integration level of the project | ||
530 | _aIssued also as CD | ||
653 | 4 | _aIntegrated Project Delivery | |
653 | 4 | _aReduction | |
653 | 4 | _aRisk | |
700 | 0 |
_aAhmed Mohamed Eldokhmasey , _eSupervisor |
|
700 | 0 |
_aMoheeb Elsaid Ibrahim , _eSupervisor |
|
905 |
_aAmira _eCataloger |
||
905 |
_aNazla _eRevisor |
||
942 |
_2ddc _cTH |
||
999 |
_c78121 _d78121 |