100 0 _aFatma Abady Awade Abady
245 1 2 _aA comparative study :
_bRisk management for banking construction and general construction projects in Egypt /
_cFatma Abady Awade Abady ; Supervised Mohamed A. Shalaby , Ehab Abdel Atty Abdel Hafiz
246 1 5 _aدراسة مقارنة :
_bإدارة المخاطر للمشروعات الإنشائية للبنوك والمشروعات الإنشائية العامة فى مصر
260 _aCairo :
_bFatma Abady Awade Abady ,
_c2020
300 _a95 P . :
_bcharts ;
_c30cm
502 _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Mechanical Design and Production
520 _aSummary: Risk management is a known as a three-stage process; risk identification, risk analysis, and risk actions. Therefore, this study is devoted to address the three-stages of risk management to both of General Construction and Banking Construction projects in Egypt. A Spearman Ranked Correlation test is applied to the two lists, and showed that risk factors for Banking is statistically different than those of the General Construction. A Design Structure Matrix (DSM) approach is used to identify the root risks among the overall top risks. A pool of risk actions is recommended, and their impact on the three project objectives are assessed by the multi criteria optimization method TOPSIS to choose the most effective few actions. The study key results present the top ranked risks for each for Banking and construction, their most effective actions, and compares such risks with internationally reported top risks
530 _aIssued also as CD
653 4 _aFuzzy
653 4 _aOPSIS
653 4 _aRisk
700 0 _aEhab Abdelatty Abdelhafiz ,
_eSupervisor
700 0 _aMohamed A. Shalaby ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aAmira
_eCataloger
905 _aNazla
_eRevisor
942 _2ddc
_cTH
999 _c79768
_d79768