245 1 0 _aIntegrated information data base and cost control system for construction projects /
_cMahmoud Malek Olwan ; Supervised Moheeb ElSaid Ibrahim
246 1 5 _aنظام متكامل لمعلوماتية قاعدة البيانات وضبط التكاليف لمشاريع التشييد
260 _aCairo :
_bMahmoud Malek Olwan ,
_c2004
300 _a200p :
_bill ;
_c30cm
502 _aThesis (M.Sc.) - Cairo University - Faculty Of Engineering - Department Of Civil Engineering
520 _aThis work presents a cost control system which could be adapted to suit any construction companyThe proposed system is company oriented and it is capable of controlling various projects at the same timeThe developed system employs two basic functions , namely , establishing a data base for all the company resources , and cost controlling all its active projectsThe proposed system , which was implemented using Visual Basic , has the ability to generate up - to - date reports for both of the two referred functionsThus supporting the decision making and enhancing the cost estimation processes
530 _aIssued also as CD
653 4 _aControl system
700 0 _aMoheeb ElSaid Ibrahim ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aAml
_eCataloger
905 _aEsam
_eRevisor
942 _2ddc
_cTH
999 _c8214
_d8214