000 02969cam a2200337 a 4500
003 EG-GiCUC
005 20250223032909.0
008 220108s2021 ua d f m 000 0 eng d
040 _aEG-GiCUC
_beng
_cEG-GiCUC
041 0 _aeng
049 _aDeposite
097 _aPh.D
099 _aCai01.18.06.Ph.D.2021.Ma.F
100 0 _aMahmoud Yosry Ibrahim Ahmed
245 1 2 _aA framework to improve performance based on the integration of risk management and lean six sigma:
_bCase study /
_cMahmoud Yosry Ibrahim Ahmed ; Supervised Abdhadi Nabih Ahmed , Farouk Tamam Shoaib
246 1 5 _aإطار لتحسين الأداء إستنادا على التكامل بين إدارة المخاطر ولين ستة سيجما :
_bدراسة حالة
260 _aCairo :
_bMahmoud Yosry Ibrahim Ahmed ,
_c2021
300 _a145 Leaves :
_bcharts ;
_c30cm
502 _aThesis (Ph.D.) - Cairo University - Faculty of Graduate Studies for Statistical Research - Department of tatistical Quality Control and Quality Assurance
520 _aThis dissertation investigated the development, implementation, and evaluation of a Continuous improvement methodology founded to improve the performance of any organization. A case study in Fast Moving Consumer Goods "FMCG" organization, called "ABC Company," provided the opportunity to assess the effects of the proposed integration between risk management and lean six-sigma methodology on the productivity indicators (measured by cycle time, Overall Equipment Effectiveness, and defects rate).The Case study was conducted in three phases: Model and Concepts Design, Data Collection, and Analysis leading to findings. During the research, validity was pursued using triangulation and theory to help maintain the Case under research control. Observing the proposed methodology "integration between risk management and lean six sigma" in a real organization allowed the researcher to describe the merging process between Risk management and Six Sigma methodology and their relationships with each other. The proposed methodology allowed treating causes of failure while executing improvement projects that improve performance and provide opportunities for successful implementation. The results of the implementation of the proposed methodology in "ABC Company" showed a 35% improvement in the cycle time of Production Line, a 33.6 increase in the Overall Equipment Effectiveness, and a 64% decrease in the number of defects units as was expected by the end of the RDMAIC (Risk Management plan, Define, Measure, Analysis, Improve, Control) implementation
530 _aIssued also as CD
653 4 _aIntegration
653 4 _aLean Six Sigma
653 4 _aRisk Management
700 0 _aAbdhadi Nabih Ahmed ,
_eSupervisor
700 0 _aFarouk Tamam Shoaib ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aNazla
_eRevisor
905 _aShimaa
_eCataloger
942 _2ddc
_cTH
999 _c83860
_d83860