Exploitation of mobile devices in tracking construction projects using BIM / (Record no. 63431)

MARC details
000 -LEADER
fixed length control field 02789cam a2200325 a 4500
003 - CONTROL NUMBER IDENTIFIER
control field EG-GiCUC
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250223031840.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 171113s2016 ua o f m 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency EG-GiCUC
Language of cataloging eng
Transcribing agency EG-GiCUC
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
049 ## - LOCAL HOLDINGS (OCLC)
Holding library Deposite
097 ## - Thesis Degree
Thesis Level M.Sc
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC)
Classification number Cai01.13.05.M.Sc.2016.Mo.E
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Mohamed Magd Eldin Mahmoud Adel Zaher
245 10 - TITLE STATEMENT
Title Exploitation of mobile devices in tracking construction projects using BIM /
Statement of responsibility, etc. Mohamed Magd Eldin Mahmoud Adel Zaher ; Supervised Mohamed Mahdy Marzouk
246 15 - VARYING FORM OF TITLE
Title proper/short title استخدام الأجهزة المحمولة في متابعة مشاريع التشييد باستخدام بناء نماذج المعلومات
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Cairo :
Name of publisher, distributor, etc. Mohamed Magd Eldin Mahmoud Adel Zaher ,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent 61 P. :
Other physical details photographs ;
Dimensions 30cm
502 ## - DISSERTATION NOTE
Dissertation note Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 ## - SUMMARY, ETC.
Summary, etc. Augmented reality (AR) is used to explore a new era of integrating the building information modeling during project{u2019}s life cycle phases with the real world to enhance the interaction, considering different aspects of construction projects. This research proposes newly developed android applications that allow visualization, monitoring, construction planning, and facility management validated through case studies during the project life cycle. Augmented Reality is utilized during construction using an application named 2BIM-Phase3 through implementing a 4D model enhanced with an augmented video to show the 5D model powered with different cost parameters. Whilst, Facility Management takes place through another application named 2BIM-FM3 that is used to illustrate different types of assets information to avoid premature asset failure, and manage the required level of service. The third application is named 2BIM-Inspect3 that is used for inspection using augmented reality as a 3D model enriched the real-world environment showing the different systems such as firefighting, HVAC, plumbing networks. Finally, 2BIM-Track3 application is cloud-based which is able to export the progress into an Excel spreadsheet from the mobile application to a remote computer to update the project{u2019}s 5D model. 2BIM-Track3 android application is capable to be accessed to any uploaded project{u2019}s 3D model as well. Case studies are presented to illustrate the uses of the proposed applications
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE
Additional physical form available note Issued also as CD
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Augmented reality
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Building information modeling
653 #4 - INDEX TERM--UNCONTROLLED
Uncontrolled term Construction projects tracking
700 0# - ADDED ENTRY--PERSONAL NAME
Personal name Mohamed Mahdy Marzouk ,
Relator term
856 ## - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://172.23.153.220/th.pdf">http://172.23.153.220/th.pdf</a>
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Nazla
Reviser Revisor
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN)
Cataloger Samia
Reviser Cataloger
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Thesis
Holdings
Source of classification or shelving scheme Not for loan Home library Current library Date acquired Full call number Barcode Date last seen Koha item type Copy number
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة قاعة الرسائل الجامعية - الدور الاول 11.02.2024 Cai01.13.05.M.Sc.2016.Mo.E 01010110073446000 22.09.2023 Thesis  
Dewey Decimal Classification   المكتبة المركزبة الجديدة - جامعة القاهرة مخـــزن الرســائل الجـــامعية - البدروم 11.02.2024 Cai01.13.05.M.Sc.2016.Mo.E 01020110073446000 22.09.2023 CD - Rom 73446.CD
Cairo University Libraries Portal Implemented & Customized by: Eng. M. Mohamady Contacts: new-lib@cl.cu.edu.eg | cnul@cl.cu.edu.eg
CUCL logo CNUL logo
© All rights reserved — Cairo University Libraries
CUCL logo
Implemented & Customized by: Eng. M. Mohamady Contact: new-lib@cl.cu.edu.eg © All rights reserved — New Central Library
CNUL logo
Implemented & Customized by: Eng. M. Mohamady Contact: cnul@cl.cu.edu.eg © All rights reserved — Cairo National University Library