Image from OpenLibrary

Artificial intelligence based model for variation contingency in construction projects / by Zeina Mohsen Hussein Hassan ; Supervisors Prof. Dr. Nabil Abdelbadie Yehia, Prof. Dr. Atef Abdelmoghny Ragab.

By: Contributor(s): Material type: TextLanguage: English Summary language: English, Arabic Producer: 2025Description: 104 pages : illustrations ; 30 cm. + CDContent type:
  • text
Media type:
  • Unmediated
Carrier type:
  • volume
Other title:
  • نموذج لاستخدام الذكاء الإصطناعى فى تقرير قيمة تقديرية لأوامر التغيير فى مشروعات التشييد [Added title page title]
Subject(s): DDC classification:
  • 624.17
Available additional physical forms:
  • Issues also as CD.
Dissertation note: Thesis (M.Sc)-Cairo University, 2023. Summary: This thesis explores the management of variation orders in construction projects and the potential integration of artificial intelligence (AI) techniques to enhance project performance. The study begins by reviewing the existing literature on variation orders and examining their types, causes, and effects. It highlights the significance of effective project planning, communication, and contract management in minimizing variations. Additionally, the research investigates the application of AI in predicting and managing variations, leveraging techniques such as machine learning and data analytics. The findings emphasize the importance of data- driven decision-making and collaboration among project stakeholders. The thesis recommends strategies to enhance variation order management, including improved project planning, strengthened contract management, and the adoption of AI techniques. Ultimately, the study contributes to the development of an innovative AI-based model for managing variation contingencies in construction projects, aiming to improve project outcomes and mitigate the disruptive effects of variations Summary: تهدف الرسالة "النموذج القائم على الذكاء الاصطناعي لطوارئ التغيير في مشاريع البناء" إلى معالجة المشكلة المعقدة والصعبة المتمثلة في أوامر التغيير في مشاريع البناء من خلال استخدام تقنيات الذكاء الاصطناعي المتقدمة (AI). غالبًا ما تؤدي أوامر التغيير، التي تتضمن تغييرات أو انحرافات عن العقد الأصلي أو نطاق المشروع، إلى اضطرابات كبيرة وتجاوز التكاليف وتأخير الجدول الزمني والنزاعات بين أصحاب المصلحة في المشروع. تعترف الأطروحة بالحاجة الماسة إلى اتباع نهج فعال واستباقي لإدارة حالات الطوارئ في مشاريع البناء لضمان نتائج المشروع الناجحة. ومن خلال اقتراح نموذج قائم على الذكاء الاصطناعي، تسعى الدراسة إلى إحداث ثورة في فهم الصناعة وإدارتها للتغيرات، وتمكين أصحاب المصلحة في المشروع من التنبؤ بتأثير أوامر التغيير بدقة وكفاءة أكبر.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Status Barcode
Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2025.Ze.A (Browse shelf(Opens below)) Not for loan 01010110093372000

Thesis (M.Sc)-Cairo University, 2023.

Bibliography: pages 91 -95.

This thesis explores the management of variation orders in construction projects and the
potential integration of artificial intelligence (AI) techniques to enhance project performance.
The study begins by reviewing the existing literature on variation orders and examining their
types, causes, and effects. It highlights the significance of effective project planning,
communication, and contract management in minimizing variations. Additionally, the research
investigates the application of AI in predicting and managing variations, leveraging techniques
such as machine learning and data analytics. The findings emphasize the importance of data-
driven decision-making and collaboration among project stakeholders. The thesis recommends
strategies to enhance variation order management, including improved project planning,
strengthened contract management, and the adoption of AI techniques. Ultimately, the study
contributes to the development of an innovative AI-based model for managing variation
contingencies in construction projects, aiming to improve project outcomes and mitigate the
disruptive effects of variations

تهدف الرسالة "النموذج القائم على الذكاء الاصطناعي لطوارئ التغيير في مشاريع البناء" إلى معالجة المشكلة المعقدة والصعبة المتمثلة في أوامر التغيير في مشاريع البناء من خلال استخدام تقنيات الذكاء الاصطناعي المتقدمة (AI). غالبًا ما تؤدي أوامر التغيير، التي تتضمن تغييرات أو انحرافات عن العقد الأصلي أو نطاق المشروع، إلى اضطرابات كبيرة وتجاوز التكاليف وتأخير الجدول الزمني والنزاعات بين أصحاب المصلحة في المشروع. تعترف الأطروحة بالحاجة الماسة إلى اتباع نهج فعال واستباقي لإدارة حالات الطوارئ في مشاريع البناء لضمان نتائج المشروع الناجحة. ومن خلال اقتراح نموذج قائم على الذكاء الاصطناعي، تسعى الدراسة إلى إحداث ثورة في فهم الصناعة وإدارتها للتغيرات، وتمكين أصحاب المصلحة في المشروع من التنبؤ بتأثير أوامر التغيير بدقة وكفاءة أكبر.

Issues also as CD.

Text in English and abstract in Arabic & English.

There are no comments on this title.

to post a comment.
Share
Cairo University Libraries Portal Implemented & Customized by: Eng. M. Mohamady Contacts: new-lib@cl.cu.edu.eg | cnul@cl.cu.edu.eg
CUCL logo CNUL logo
© All rights reserved — Cairo University Libraries
CUCL logo
Implemented & Customized by: Eng. M. Mohamady Contact: new-lib@cl.cu.edu.eg © All rights reserved — New Central Library
CNUL logo
Implemented & Customized by: Eng. M. Mohamady Contact: cnul@cl.cu.edu.eg © All rights reserved — Cairo National University Library