المشروعات المائية على النيل الأزرق وروافده وآثارها على التنمية الاقتصادية في إثيوبيا : دراسة في الجغرافيا الاقتصادية) بإستخدام نظم المعلومات الجغرافية والإستشعار عن بعد / إعـــداد غادة حسن عبد الموجود؛إشـــراف أ.د/ السعيد إبراهيم البدوي، أ.د/ضياء الدين القوصي.
Material type:
- text
- Unmediated
- volume
- Water projects on the blue nile and its tributaries and their impact on economic development in ethiopia : A study in economic geography using geographic information systems and remote sensing [Added title page title]
- 910.133
- صدر أيضًا كقرص مدمج.
Item type | Current library | Home library | Call number | Status | Barcode | |
---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.16.07.Ph.D.2024.غا.م (Browse shelf(Opens below)) | Not for loan | 01010100032135000 |
أطروحة (دكتوراه)-جامعة القاهرة، 2024.
ببليوجرافيا: صفحات 230-243.
تضمت الدراسة خمسة فصول تسبقها مقدمة، وتمهيد وتنتهي بالخاتمة، تعرض المقدمة أهمية الموضوع وسبب اختياره والهدف منه والدراسات السابقة ومنهج الدراسة وأخيراً خطة الدراسة التي تتناول الفصول الخمسة علي النحو التالي حيث تبدأ من الأعم ثم الأخص أي من إثيوبيا أولا ثم إلي حوض النيل الأزرق ثم الأحواض الفرعية وأخيرا إلي المشروعات المائية:- تناول الفصل الأول : المعطيات الجغرافية الطبيعية لهضبة الحبشة والتي أدت الى قيام المشروعات المائية على النيل الأزرق وروافده ,وتأثير الموقع الجغرافي لإثيوبيا لم يقتصر فقط على كونها دولة حبيسة ولكن امتد التأثير ليشمل العديد من العوامل الطبيعية الأخرى حيث أثر الموقع على المناخ الأمر الذى بدوره كان له التأثير على موارد المياه وكميتها وهيدرولوجية الأنهار داخل الدولة وناقش الفصل الثاني: أثر الخصائص الجغرافية الطبيعية في حوض النيل الأزرق وروافده في إثيوبيا والتي أدت الى قيام المشروعات المائية عليه في إثيوبيا، بينما يأتي الفصل الثالث لتناول الحوافز والدوافع التي أدت الى قيام المشروعات المائية على النيل الأزرق وروافده حيث تعانى إثيوبيا من تحديات تنموية وبيئية متداخلة و تشمل روابط معقدة عبر القطاعات الاقتصادية ـ وتعتبر إثيوبيا إن الطاقة الكهرومائية هي الحل الأول للتنمية المستدامة خاصة وان بها اماكن كثيرة ملائمة لإنشاء الخزانات في منطقة النيل الأزرق ـ وتعتبر إن الطاقة الكهرومائية هي العمود الفقري لمستقبل البلاد ،وتمتلك إثيوبيا إمكانات هائلة من الطاقة الكهرومائية غير المستغلة في منطقة النيل الأزرق، وعلى الجانب الاخر تواجه تحديات في مجال الطاقة والتي أدت الى استثمار إمكاناتها لمواجهة تلك التحديات. وناقش الفصل الرابع: المشروعات المائية المقامة على النيل الأزرق حيث تواجه المشروعات المائية المقامة على النيل الأزرق في إثيوبيا عدم التوافق بين الموارد المائية والاحتياجات المائية بسبب مشاريع الري المخطط لها من جانب واحد، والتي تخلق بدورها تنمية غير عادلة بين دول الحوض. وقد تناول الفصل المشروعات المائية المقامة والمتوقعة والجاري اقامتها على النيل الأزرق في إثيوبيا والتي يغلب عليها الهدف التنموي الأكبر وهو الانشاء من أجل الري والتوسع الزراعي ، ولذا ترجع أهمية النيل الأزرق بالنسبة لإثيوبيا في كونه مستقبل للتنمية بالرغم من وجود انهار اخري يمكن استغلالها في الطاقة النظيفة ومواقع اخري واعدة يمكن استغلالها في طاقة الرياح ، كذلك يعتبر تخزين المياه وتنمية الموارد المائية في أعالي حوض النيل الأزرق لتحقيق التنمية الاجتماعية والاقتصادية المستدامة من أهم الاهداف التي قامت إثيوبيا بإعداد عدة دارسات عديدة عنها لتحقيق هذا الهدف .
وتناول الفصل الخامس مشروع تانا بيليس كدراسة حالة و الأثار المترتبة عليه. كما تناول الفصل المشروعات المائية الاربعة المقامة على الشريان الرئيسى للنيل الازرق والاثار المترتبه عليها
The study includes five chapters, preceded by an introduction, a preface, and ending with a conclusion. The introduction presents the importance of the topic, the reason for choosing it, its purpose, previous studies, the study methodology, and finally the study plan, which deals with the five chapters as follows, starting from the most general and then the most specific, that is, from Ethiopia first, then to the Blue Nile Basin, then the basins. Subsidiary and finally to water projects:- The first chapter dealt with the natural geographical data of the Abyssinian Plateau, which led to the establishment of water projects on the Blue Nile and its tributaries, and the impact of the geographical location of Ethiopia was not limited only to its being a landlocked country, but the impact extended to include many other natural factors, as the location affected the climate, which in turn had a The impact on water resources, their quantity, and the hydrology of rivers within the country. The second chapter discussed: The impact of the natural geographical characteristics in the Blue Nile Basin and its tributaries in Ethiopia, which led to the establishment of water projects on it in Ethiopia, while the third chapter discusses the incentives and motivations that led to the establishment of water projects on the Blue Nile. And its tributaries, as Ethiopia suffers from interrelated development and environmental challenges that include complex links across economic sectors. Ethiopia considers hydroelectric energy to be the first solution for sustainable development, especially since it has many suitable places for establishing reservoirs in the Blue Nile region. It considers hydroelectric energy to be the backbone of the country’s future. Ethiopia has huge untapped hydroelectric potential in the Blue Nile region, and on the other hand, it faces challenges in the field of energy, which led to investing its potential to meet those challenges. The fourth chapter discussed: Water projects established on the Blue Nile. Water projects established on the Blue Nile in Ethiopia face a mismatch between water resources and water needs due to unilaterally planned irrigation projects, which in turn creates unfair development among the countries of the basin. The chapter dealt with the established, expected, and ongoing water projects on the Blue Nile in Ethiopia, which are dominated by the largest development goal, which is construction for irrigation and agricultural expansion. Therefore, the importance of the Blue Nile for Ethiopia is due to it being a future for development, despite the presence of other rivers that can be exploited for clean energy and sites. Other promising projects can be exploited in wind energy. Water storage and development of water resources in the upper Blue Nile Basin to achieve sustainable social and economic development are among the most important goals on which Ethiopia has prepared several studies to achieve this goal.
The fifth chapter dealt with the Tana Belis project as a case study and its implications. The chapter also dealt with the four water projects built on the main artery of the Blue Nile and their implications.
صدر أيضًا كقرص مدمج.
النص بالعربية والملخص باللغة الإنجليزية والعربية.
There are no comments on this title.