| 000 | 01781nam a2200361 a 4500 | ||
|---|---|---|---|
| 003 | EG-GiCUC | ||
| 005 | 20250223025601.0 | ||
| 008 | 090416s2009 ua dh f m 000 0 eng d | ||
| 040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
| 041 | 0 | _aeng. | |
| 049 | _aDeposite | ||
| 097 | _aPh.D. | ||
| 099 | _aCai01.13.07.Ph.D.2009.Na.M. | ||
| 100 | 0 | _aNadia Mohamed Abdelsalam Eshra | |
| 245 | 1 | 0 |
_aModeling and economical optimization for operation of aswan high dam power station and mubarak pump station / _cNadia Mohamed Abdelsalam Eshra ; Supervised Mohamad Mammdoh Abdelaziz , Ahmed Faheem Zobaa , Medhat Saad Aziz |
| 246 | 1 | 5 | _aنمدجة التوليد وتعظيم القيمة الإقتصادية من تشغيل محطتي كهرباء السد العالي وطلمبات مبارك العملاقة |
| 260 |
_aCairo : _bNadia Mohamed Abdelsalam Eshra , _c2009 |
||
| 300 |
_a139 P. : _bcharts , facsimiles ; _c30cm. |
||
| 502 | _aThesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Electrical Power and Machines | ||
| 520 | _aThesis is included modeling of the hydropower generation from Aswan High Dam power station with studing the effect of the south valley project and the multiple low inflow years with consider all natural conditions at lake Nasser on the hydropower generation from AHD power station | ||
| 530 | _aIssued also as CD | ||
| 653 | 4 | _aHigh Aswan Dam | |
| 653 | 4 | _aHydropower in Egypt | |
| 653 | 4 | _aSouth valley project | |
| 700 | 0 |
_aAhmed Faheem Zobaa , _eSupervisor |
|
| 700 | 0 |
_aMedhat Saad Aziz , _eSupervisor |
|
| 700 | 0 |
_aMohamad Mammdoh Abdelaziz , _eSupervisor |
|
| 856 | _uhttp://172.23.153.220/th.pdf | ||
| 902 | _a1 | ||
| 905 |
_aMustafa _eRevisor |
||
| 905 |
_aSamia _eCataloger |
||
| 942 |
_2ddc _cTH |
||
| 999 |
_c16096 _d16096 |
||