000 01781nam a2200361 a 4500
003 EG-GiCUC
005 20250223025601.0
008 090416s2009 ua dh f m 000 0 eng d
040 _aEG-GiCUC
_beng
_cEG-GiCUC
041 0 _aeng.
049 _aDeposite
097 _aPh.D.
099 _aCai01.13.07.Ph.D.2009.Na.M.
100 0 _aNadia Mohamed Abdelsalam Eshra
245 1 0 _aModeling and economical optimization for operation of aswan high dam power station and mubarak pump station /
_cNadia Mohamed Abdelsalam Eshra ; Supervised Mohamad Mammdoh Abdelaziz , Ahmed Faheem Zobaa , Medhat Saad Aziz
246 1 5 _aنمدجة التوليد وتعظيم القيمة الإقتصادية من تشغيل محطتي كهرباء السد العالي وطلمبات مبارك العملاقة
260 _aCairo :
_bNadia Mohamed Abdelsalam Eshra ,
_c2009
300 _a139 P. :
_bcharts , facsimiles ;
_c30cm.
502 _aThesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Electrical Power and Machines
520 _aThesis is included modeling of the hydropower generation from Aswan High Dam power station with studing the effect of the south valley project and the multiple low inflow years with consider all natural conditions at lake Nasser on the hydropower generation from AHD power station
530 _aIssued also as CD
653 4 _aHigh Aswan Dam
653 4 _aHydropower in Egypt
653 4 _aSouth valley project
700 0 _aAhmed Faheem Zobaa ,
_eSupervisor
700 0 _aMedhat Saad Aziz ,
_eSupervisor
700 0 _aMohamad Mammdoh Abdelaziz ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
902 _a1
905 _aMustafa
_eRevisor
905 _aSamia
_eCataloger
942 _2ddc
_cTH
999 _c16096
_d16096