000 10575namaa22004211i 4500
003 OSt
005 20250914142055.0
008 250827s2024 ua a|||frm||| 000 0 eng d
040 _aEG-GICUC
_bara
_cEG-GICUC
_dEG-GICUC
_erda
041 0 _aara
_bara
_beng
049 _aإيداع
082 0 4 _a658.4056
092 _a658.4056
_221
097 _aدكتوراه‎
099 _aCai01.18.06.Ph.D.2024.شا.إ
100 0 _a،شاهيناز أحمد لطفي كمال الدين شومان
_eإعداد.
245 1 0 _aإجراءات مقترحة لإدارة مخاطر طاقة الهيدروجين الأخضر بمصر /
_cمقدمة من الباحثــــة شاهيناز أحمد لطفي كمال الدين شومان؛ تحت إشــــــراف الأســـــتاذ الدكتور/ محمـــــد نجيـــــب عبد الفتاح، دكتــــــــورة / رباب صبحي مخلوف.
246 1 5 _aProposed procedures to manage the risks of green hydrogen energy in egypt /
264 0 _c2024.
300 _a140 ورقة :
_bإيضاحيات ؛
_c30 cm. +
_eCD.
336 _atext
_2rda content
337 _aUnmediated
_2rdamedia
338 _avolume
_2rdacarrier
502 _aأطروحة (دكتوراه)-جامعة القاهرة، 2024.
504 _aببليوجرافيا: صفحات 126-131.
520 _aهدفت هذه الدراسة الى وضع إجراءات مقترحة لإدارة مخاطر طاقة الهيدروجين الأخضر بمصر، بالاضافة الى التعرف على دور تحديد المخاطر المحتملة فى ادارة مخاطر طاقة الهيدروجين الاخضر بوزارة الكهرباء والطاقة المتجددة، وتحديد دور تحليل ربطة العنق فى ادارة مخاطر طاقة الهيدروجين الاخضر بوزارة الكهرباء والطاقة المتجددة، وتحديد دور اجراء ورش العمل فى ادارة مخاطر طاقة الهيدروجين الاخضر بوزارة الكهرباء والطاقة المتجددة، بالاضافة الى تحديد دور تطوير معايير الاداء لعناصر السلامة الحرجة فى ادارة مخاطر طاقة الهيدروجين الاخضر بوزارة الكهرباء والطاقة المتجددة، ومن اجل التعرف على هذا الهدف تم توزيع 367 استمارة، وبعد مراجعة البيانات اكتشفت الباحثة أن عدد المستجيبين 352 فرد، وقد تم استخدام برنامج spss من اجل تحليل هذه البيانات. خلصت النتائج الى: • قبول الفرض الاول القائل انه "توجد علاقة ذات دلالة إحصائية بين تحديد المخاطر المحتملة وإدارة مخاطر طاقة الهيدروجين الأخضر بوزارة الكهرباء"، يعني ذلك أن تحديد المخاطر المحتملة هو الخطوة الأولى والضرورية في عملية إدارة مخاطر طاقة الهيدروجين الأخضر، وعندما يتم تحديد المخاطر المحتملة، يتم تحليل العوامل والأحداث التي يمكن أن تتسبب في وقوع مشاكل أو خسائر في تطبيق طاقة الهيدروجين الأخضر. وبناءً على هذا التحليل، يتم تحديد المخاطر الرئيسية التي يجب التركيز عليها والتعامل معها . • قبول الفرض الثانى القائل انه "توجد علاقة ذات دلالة إحصائية بين تحليل ربطة العنق وإدارة مخاطر طاقة الهيدروجين الأخضر بوزارة الكهرباء"، وذلك يعني أن تحليل ربطة العنق الذى يتمثل فى تحليل وتقييم العوامل المحيطة والظروف التي يمكن أن تؤثر على سلامة واستدامة مشروع طاقة الهيدروجين الأخضر، وقد يتضمن ذلك تحليل العوامل البيئية والاجتماعية والاقتصادية والسياسية التي قد تكون لها تأثير على تنفيذ وتشغيل مشروع الهيدروجين الأخضر. • قبول الفرض الثالث القائل انه: "توجد علاقة بين اجراء ورش العمل وبين ادارة مخاطر طاقة الهيدروجين الاخضر بوزارة الكهرباء والطاقة المتجددة"، وذلك يعنى أن هناك توجه أو جهود من جانب الوزارة لتوعية العاملين والمهتمين بمخاطر طاقة الهيدروجين الأخضر وكيفية التعامل معها بشكل آمن وفعال، ويكون ذلك من خلال موارد ودروس عملية وتوجيهات لمساعدة الأفراد والشركات في فهم وإدارة المخاطر المحتملة المرتبطة بتقنية الهيدروجين الأخضر. • قبول الفرض الرابع القائل انه "توجد علاقة ذات دلالة إحصائية بين تطوير معايير الاداء لعناصر السلامة الحرجة وإدارة مخاطر طاقة الهيدروجين الأخضر بوزارة الكهرباء" ، ويعنى ذلك أن تطوير معايير الأداء لعناصر السلامة الحرجة يشير إلى وضع معايير فنية دقيقة للعناصر الحيوية التي تؤثر في سلامة مشروع طاقة الهيدروجين الأخضر، ويتعين على عناصر السلامة الحرجة أن تكون قواعد ومواصفات لضمان تصميم وتشغيل آمن وفعال للمشروع، ويمكن أن تشمل هذه المعايير الأداء المطلوب، والمواصفات التقنية، والإجراءات السلامة، والتدابير الوقائية.
520 _aThis study aimed to develop proposed procedures for managing the risks of Green hydrogen Energy in Egypt, in addition to identifying the role of identifying potential risks in managing the risks of green hydrogen energy at the Ministry of Electricity and Renewable Energy, identifying the role of bowtie analysis in managing the risks of green hydrogen energy at the Ministry of Electricity and Renewable Energy, and defining the role of conducting workshops in managing the risks of green hydrogen energy at the Ministry of Electricity and Renewable Energy , in addition to identifying the role of developing performance standards for critical safety elements in managing the risks of Green hydrogen energy at the Ministry of Electricity and Renewable Energy . In order to identify this goal, 367 questionnaires were distributed, and after reviewing the data, the researcher discovered that the number of respondents was 352 individuals, and it was used SPSS program to analyzed this data The results concluded that: • The first hypothesis was accepted, which states that “there is a statistically significant relationship between identifying potential risks and managing the risks of Green hydrogen energy at the Ministry of Electricity.” This means that identifying potential risks is the first and necessary step in the process of managing green hydrogen energy risks, and when the potential risks are identified Factors and events that can cause problems or losses in green hydrogen energy application are analyzed. Based on this analysis, the main risks that must be focused on and dealt with are identified. • The second hypothesis was accepted, which says that “there is a statistically significant relationship between the bowtie analysis and managing the risks of Green hydrogen energy at the Ministry of Electricity.” This means that the bowtie analysis, which is represented by analyzing and evaluating the surrounding factors and conditions that could affect the safety and sustainability of the green hydrogen energy project. This may include analyzing the environmental, social, economic and political factors that may have an impact on the implementation and operation of the green hydrogen project. • Accepting the third hypothesis, which says: “There is a relationship between conducting workshops and managing the risks of green hydrogen energy in the Ministry of Electricity and Renewable Energy. This means that there is a direction or effort on the part of the Ministry to educate workers and those interested in the risks of green hydrogen energy and how to deal with them safely and effectively, and this will be With resources, practical lessons and guidance to help individuals and businesses understand and manage the potential risks associated with green hydrogen technology. • Accepting the fourth hypothesis that “there is a statistically significant relationship between the development of Performance standards for critical safety elements and managing the risks of Green hydrogen energy at the Ministry of Electricity. This means that developing performance standards for critical safety elements refers to setting precise technical standards and standards for the vital elements that affect the safety of the green hydrogen energy project. These critical safety elements must be rules and specifications to ensure the safe and efficient design and operation of the project. These standards may include required performance, technical specifications, safety procedures, and preventive measures.
530 _aصدر أيضًا كقرص مدمج.
546 _aالنص بالعربية والملخص باللغة الإنجليزية والعربية.
650 7 _aإدارة الازمات
_2qrmak
653 0 _aادارة مخاطر طاقة الهيدروجين الاخضر
_aتحليل ربطة العنق
_aعناصر السلامة الحرجة
700 0 _aمحمـــــد نجيـــــب عبد الفتاح
_eمشرف أطروحة.
700 0 _aرباب صبحي مخلوف
_eمشرف أطروحة.
900 _b01-01-2024
_cمحمـــــد نجيـــــب عبد الفتاح
_cرباب صبحي مخلوف
_dايمان مصطفي مسلم
_dأمير مسعد البسيوني
_Uجامعة القاهرة
_Fكلية الدراسات العليا للبحوث الاحصائية
_Dقسم إدارة المخاطر والأزمات
905 _aSara
_eAfaf
942 _2ddc
_cTH
_e21
_n0
999 _c173889