| 100 | 0 |
_a،حاتم محمد أحمد على البرعى _eإعداد. |
|
| 245 | 1 | 0 |
_aتحسـين مؤشـر البناء الذكـــى بمشروعات التشييــــــد بإستخــدام هندسة القيمة / _cإعداد حاتم محمد أحمد على البرعى؛ إشراف أستاذ دكتور / دعد محمد فؤاد، أستاذ مساعد دكتور مهندس / أشرف عبدالونيس بشر. |
| 246 | 1 | 5 | _aImproving the smart buildability score of construction projects using value engineering / |
| 264 | 0 | _c2024. | |
| 300 |
_a208 ورقة : _bإيضاحيات ؛ _c30 cm. + _eCD. |
||
| 336 |
_atext _2rda content |
||
| 337 |
_aUnmediated _2rdamedia |
||
| 338 |
_avolume _2rdacarrier |
||
| 502 | _aأطروحة (دكتوراه)-جامعة القاهرة، 2024. | ||
| 504 | _aببليوجرافيا: صفحات 188-193. | ||
| 520 | _aيهدف البحث إلى تحسين مؤشر البناء الذكي عبر تطبيق هندسة القيمة في تصميم المشروعات، مع التركيز على تقليل التكاليف وزيادة كفاءة الموارد المستخدمة في تنفيذ المشروعات. يُظهر البحث أهمية مرحلة التصميم كعامل حاسم في تحقيق أهداف المشروع، إذ تمثل تلك المرحلة حوالي 3% فقط من التكلفة الإجمالية للمشروع لكنها تؤثر بشكل كبير يتجاوز 55% على التكلفة النهائية. اعتمدت الدراسة على استخدام مؤشر البناء الذكي (BS) كأداة لتحليل الأنظمة المختلفة، مثل الهيكل الإنشائي، الجدران، والخصائص الأخرى، مع استبدال مؤشر توفير العمالة التقليدي (LSI) بمؤشر هندسة القيمة (VEI) للحصول على نتائج أكثر دقة وموثوقية. تبنت الدراسة منهجًا وصفيًا تحليليًا، واعتمدت على استبيانات شملت 130 ردًا كاملاً ومقابلات نصف مهيكلة مع خبراء في المجال. كما استخدمت التحليل الإحصائي والشبكات العصبية لتحديد الأوزان النسبية للمعايير المختلفة التي تؤثر على جودة التصميم. نتج عن الدراسة إعداد عشر عمليات رئيسية لكل من الأنظمة الثلاثة المحددة في المعادلة، مع توضيح المدخلات والمخرجات المطلوبة لكل عملية. ساهمت هذه العمليات في تحسين الكفاءة التصميمية بشكل كبير، مما يتيح تطبيق تلك النتائج في مختلف البيئات والقطاعات، لا سيما في المشاريع الكبيرة والمعقدة. تؤكد الدراسة كذلك على أهمية التكامل بين المعايير الفنية والتحليل الإحصائي لتحقيق تصميم مثالي يسهم في تحقيق أهداف المشروعات بكفاءة أكبر واستدامة أعلى. | ||
| 520 | _aThis study aims to enhance the Smart Buildability Score (BS) by applying Value Engineering (VE) in project design, focusing on cost reduction, resource efficiency, and improving overall project quality. The study highlights the critical role of the design phase, which accounts for only 3% of the total project cost yet influences over 55% of the overall expenditure. The SBS formula considers multiple systems, such as structural elements, walls, and other key features, while replacing the traditional Labour Saving Index (LSI) with the Value Engineering Index (VEI) to achieve more precise and reliable results. A descriptive analytical approach was adopted, involving 130 completed surveys and semi-structured interviews with experts in construction and project management. Advanced techniques, including neural network models and statistical analysis, were employed to determine the relative weight of design criteria affecting project outcomes. The findings resulted in the creation of ten processes for each of the three primary systems, detailing specific inputs and outputs for every process. These developments significantly enhance design optimization, enabling their application across diverse environments and contexts, particularly in large-scale and complex projects. The study underscores the importance of integrating technical standards and data-driven methods to achieve optimal designs that align with project goals, improve efficiency, and ensure long-term sustainability. | ||
| 530 | _aصدر أيضًا كقرص مدمج. | ||
| 546 | _aالنص بالعربية والملخص باللغة الإنجليزية والعربية. | ||
| 650 | 7 |
_aإدارة المشروعات _2qrmak |
|
| 653 | 0 |
_aهندسة القيمة _aتحليل الوظيفة _aمؤشر القيمة |
|
| 700 | 0 |
_aدعد محمد فؤاد _eمشرف أطروحة. |
|
| 700 | 0 |
_aأشرف عبدالونيس بشر _eمشرف أطروحة. |
|
| 900 |
_b01-01-2024 _cدعد محمد فؤاد _cأشرف عبدالونيس بشر _Uجامعة القاهرة _Fكلية الدراسات العليا للبحوث الإحصائية _Dقسم ادارة المشروعات |
||
| 905 |
_aSara _eAfaf |
||
| 942 |
_2ddc _cTH _e21 _n0 |
||
| 999 | _c176450 | ||