000 01385namaa22003131i 4500
005 20251231133840.0
008 251231s1994 u a|||fr|m|| 000 0 eng d
040 _aEG-GICUC
_beng
_cEG-GICUC
_dEG-GICUC
_erda
041 0 _aeng
_beng
_bara
049 _aDeposit
097 _aM.Sc
099 _aCai01.13.05.M.Sc.1994.Ai.T
100 0 _aAiman Abd-El-Azeez A. Rashwan ,
_epreparation.
245 1 0 _aTime and cost control Applica tions in the Egyptian construction in dusty/
_cBy Aiman Abd-El-Azeez A. Rashwan ; Supervised.Prof.Dr. Aly Abd-Elrahman , Dr. Adel El-Samadony ,
246 1 5 _aتطبيقات نظم التحكم فى الزمن والتكاليف فى مجالات صناعة التشييد فى مصر
264 0 _c1994
300 _a264 Leaves :
_billustrations ;
_c30 cm. +
336 _2rda content
_atext
337 _2rdamedia
_aUnmediated
338 _2rdacarrier
_avolume
502 _a Thesis (M.Sc.)-Cairo University, 1994
504 _aBibliography: pages 262 : 264
653 0 _aTime and cost control Applica tions in the Egyptian construction in dusty
700 0 _aAly Abd-Elrahman
_ethesis advisor.
700 0 _a Adel El-Samadony
_ethesis advisor.
900 _D Department of Engineering
_F Faculty of Engineering
_U Cairo University
_b1994
_cAly Abd-Elrahman
_c Adel El-Samadony
_dAly Abd-Elrahman
905 _aNagat
942 _2ddc
_cTH
_e21
_n0
999 _c177248