| 000 | 01641cam a2200337 a 4500 | ||
|---|---|---|---|
| 003 | EG-GiCUC | ||
| 005 | 20250223030358.0 | ||
| 008 | 110327s2011 ua e f m 000 0 eng d | ||
| 040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
| 041 | 0 | _aeng | |
| 049 | _aDeposite | ||
| 097 | _aM.Sc | ||
| 099 | _aCai01.13.05.M.Sc.2011.Ah.S | ||
| 100 | 0 | _aAhmed Younes Ahmed Zaki | |
| 245 | 1 | 0 |
_aSimulation based decision tool for planning the production of ready mixed concrete plants / _cAhmed Younes Ahmed Zaki ; Supervised Moheeb El-Said Ibrahim , Mohamed Mahdy Marzouk |
| 246 | 1 | 5 | _aاستخدام اسلوب المحاكاة لتخطيط انتاجية محطات خلط الخرسانة الجاهزة |
| 260 |
_aCairo : _bAhmed Younes Ahmed Zaki , _c2011 |
||
| 300 |
_a175 P. : _bplans ; _c30cm |
||
| 502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering | ||
| 520 | _aSimulation is applied to ready mixed concrete operations to analyze alternative solutions. A simulation model is developed for the one plant one site operations using STROBOSCOPE simulation systems. The model simulates the activities of the truck mixer. Data collection reports are designed to collect timing and duration data for these activities | ||
| 530 | _aIssued also as CD | ||
| 653 | 4 | _aDiscrete event simulation | |
| 653 | 4 | _aReady mixed concrete | |
| 653 | 4 | _aSensitivity analysis | |
| 700 | 0 |
_aMohamed Mahdy Marzouk , _eSupervisor |
|
| 700 | 0 |
_aMoheeb Elsaid Ibrahim , _eSupervisor |
|
| 856 | _uhttp://172.23.153.220/th.pdf | ||
| 905 |
_aNazla _eRevisor |
||
| 905 |
_aSamia _eCataloger |
||
| 942 |
_2ddc _cTH |
||
| 999 |
_c33473 _d33473 |
||