| 000 | 02713cam a2200349 a 4500 | ||
|---|---|---|---|
| 003 | EG-GiCUC | ||
| 005 | 20250223031818.0 | ||
| 008 | 171002s2017 ua d f m 000 0 eng d | ||
| 040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
| 041 | 0 | _aeng | |
| 049 | _aDeposite | ||
| 097 | _aM.Sc | ||
| 099 | _aCai01.13.12.M.Sc.2017.Re.I | ||
| 100 | 0 | _aReem Said Mohamed Abdallah | |
| 245 | 1 | 0 |
_aIntroducing risk modelling in managing engineering service providers : _bCase study: egyptian engineering service Consultant firm / _cReem Said Mohamed Abdallah ; Supervised Fouad Khalaf , Tarek M. Abdelhamid , Tariq M. Saleh |
| 246 | 1 | 5 |
_aادخال نمذجة المخاطر فى خدمات الاستشارات الهندسية : _bدراسة تطبيقية على حالة احد مكاتب الاستشارات الهندسية |
| 260 |
_aCairo : _bReem Said Mohamed Abdallah , _c2017 |
||
| 300 |
_a124 P. : _bcharts ; _c30cm |
||
| 502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Metallurgical Engineering | ||
| 520 | _aEngineering professional consulting as a service based industry is crucial for the development as they provide practical solutions for several entities such as institutions, industries, and construction projects. This research introduce risk based model as a tool for improving management of engineering processes of consultation service. Preliminary risk assessment model (PRA) is adopted as tool for identifying, evaluating and handling all risks to bring undesired events, in life or in business, to acceptable or tolerable values. The model aligned with the traditional five steps of risk management, as it commenced by functional analysis for the studied system, and hazards identification. PRA model present additional step here, which is prioritizing the interaction between hazards and vulnerable elements of the system to focus on hazardous situations which need immediate decision of analysis. Afterwards, the model is analyzing risk scenarios which are generated from hazardous situations. Finally, PRA is providing preventive and protective measures for unacceptable risks. The model is semi-quantitative as it allows for identifications scales for risk evaluation parameters (probability of occurrence of top event and severity of its consequences). | ||
| 530 | _aIssued also as CD | ||
| 653 | 4 | _aPRA model | |
| 653 | 4 | _aRisk assessment | |
| 653 | 4 | _aRisk modeling | |
| 700 | 0 |
_aFouad Khalaf , _eSupervisor |
|
| 700 | 0 |
_aTarek M. Abdelhamid , _eSupervisor |
|
| 700 | 0 |
_aTariq M. Saleh , _eSupervisor |
|
| 856 | _uhttp://172.23.153.220/th.pdf | ||
| 905 |
_aNazla _eRevisor |
||
| 905 |
_aShimaa _eCataloger |
||
| 942 |
_2ddc _cTH |
||
| 999 |
_c62699 _d62699 |
||