245 1 0 _aDevelopment of a client-based decision support system for the project success evaluation in Egypt /
_cYasser Wafik Mohamed Eraky ; Supervised Moheeb Elsaid Ibrahim , Nael Yousry Sleem Zabel
246 1 5 _a{uFE97}{uFEC4}{uFEEE}{uFEF3}{uFEAE} {uFEE7}{uFEC8}{uFE8E}م {uئإؤئ}{uئإءء}{uئإأآ}{uئإإ٢} إ{uئإ٩٧}{uئإء٨}{uئإ٨إ}ذ {uئإؤ٧}{uئإءإ}ار ا{uئإؤئ}{uئإإ٤}{uئإ٨إ}{uئإؤئ}{uئإؤء} {uئإؤ٣}{uئإئ٢} {uئإ٩٧}{uئإؤ٨}{uئإءء}{uئإئ٣}{uئإءإ} {uئإإ٧}{uئإء٠}{uئإ٨إ}ح ا{uئإؤئ}{uئإإ٤}{uئإآ٨}{uئإءإ}و{uئإأآ}{uئإ٨إ}ت {uئإ٩١}{uئإء٠}{uئإإأ}{uئإإإ}ر{uئإئ٣}{uئإإء} {uئإإ٣}{uئإآأ}{uئإءإ} ا{uئإؤئ}{uئإأأ}{uئإءإ}{uئإ٩١}{uئإئ٤}{uئإإء}
260 _aCairo :
_bYasser Wafik Mohamed Eraky ,
_c2018
300 _a100 , 40 P. :
_bcharts ;
_c30cm
502 _aThesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
520 _aDifferent types of construction projects have been achieved in Egypt with extreme delay or cost overrun which mainly considered unsuccessful projects. To judge or decide if the project will success or not is not easy decision, but it is a mandatory to know that in an early stage of the project. The primary goal of this study is to develop decision support system that enables the decision maker to determine the expected project success degree which named a client-based decision support system for the project{u2019}s success evaluation in Egypt Cb-DSSPSE
530 _aIssued also as CD
653 4 _aConstruction management
653 4 _aCritical success factor
653 4 _aEgypt
700 0 _aMoheeb Elsaid Ibrahim ,
_eSupervisor
700 0 _aNael Yousry Sleem Zabel ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aNazla
_eRevisor
905 _aSamia
_eCataloger
942 _2ddc
_cTH
999 _c67694
_d67694