| 000 | 01761cam a2200337 a 4500 | ||
|---|---|---|---|
| 003 | EG-GiCUC | ||
| 005 | 20250223032315.0 | ||
| 008 | 190615s2018 ua d f m 000 0 eng d | ||
| 040 |
_aEG-GiCUC _beng _cEG-GiCUC |
||
| 041 | 0 | _aeng | |
| 049 | _aDeposite | ||
| 097 | _aM.Sc | ||
| 099 | _aCai01.13.12.M.Sc.2018.Ah.I | ||
| 100 | 0 | _aAhmed Ibrahim Elgendy | |
| 245 | 1 | 0 |
_aIntroducing knowledge management, triz and jugaad concepts to risk management : _bapplication to a construction case study / _cAhmed Ibrahim Elgendy ; Supervised Fouad K. Mohamed , Tariq M. Ali Saleh |
| 246 | 1 | 5 |
_aإدراج مفاهيم إدارة المعرفة والإبداع والاستدامة في إدارة المخاطر : _bدراسة حالة في التشييد |
| 260 |
_aCairo : _bAhmed Ibrahim Elgendy , _c2018 |
||
| 300 |
_a129 P. : _bcharts ; _c30cm |
||
| 502 | _aThesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Metallurgical Engineering | ||
| 520 | _athis research integrates four concepts creating a new comprehensive risk management approach called ''RKTS approach'' where R refers to risk, K refers to knowledge management, T refers to (innovation theory) and S refers to theory of sustainable innovation (JUGAAD). Although risk management is considered a new revolutionary science, the last threev concepts included in the approach (RKTS) are considered newer and revolutionary too | ||
| 530 | _aIssued also as CD | ||
| 653 | 4 | _aBlack swan | |
| 653 | 4 | _aRisk management | |
| 653 | 4 | _aTRIZ | |
| 700 | 0 |
_aFouad K. Mohamed , _eSupervisor |
|
| 700 | 0 |
_aTariq M. Ali Saleh , _eSupervisor |
|
| 856 | _uhttp://172.23.153.220/th.pdf | ||
| 905 |
_aAsmaa _eCataloger |
||
| 905 |
_aNazla _eRevisor |
||
| 942 |
_2ddc _cTH |
||
| 999 |
_c72424 _d72424 |
||