000 02933cam a2200337 a 4500
003 EG-GiCUC
005 20250223032910.0
008 220108s2021 ua d f m 000 0 eng d
040 _aEG-GiCUC
_beng
_cEG-GiCUC
041 0 _aeng
049 _aDeposite
097 _aPh.D
099 _aCai01.18.06.Ph.D.2021.En.E
100 0 _aEnje Fouad Sayed
245 1 0 _aEnhancing performance of a pharmaceutical manufacturing company /
_cEnje Fouad Sayed ; Supervised Hegazy Zaher , Essam Ali
246 1 5 _aتحسين الأداء لشركة تصنيع الدواء
260 _aCairo :
_bEnje Fouad Sayed ,
_c2021
300 _a142 Leaves :
_bcharts ;
_c30cm
502 _aThesis (Ph.D.) - Cairo University - Faculty of Faculty of Graduate Studies for Statistical Research - Department of Statistical Quality Control and Quality Assurance
520 _aTo survive in a competitive market, improving quality and productivity of product or process is a must for any company. For the release of pharmaceutical products into the drug market; most of the pharmaceutical companies depend on acceptance criteria - that are set internally, regulatory and/or pharmacopeial Specifications.This study is about to apply Lean Six Sigma in the production processing line and on final product to reduce defects by identifying where the highest waste is occurred at and to give suggestion for improvement.The approach used in this study is direct observation, thorough examination of production process lines, information has been collected from potential customers (internally and externally) and company{u2019}s workers through internal complains and product return and exploit these data in cause-and-effect diagram, Pareto chart/analysis and control chart (p-chart) and effective brainstorming sessions. It has been found that the company has many problems; specifically, there is high rejection or waste in the production processing line, high customer complaints and high non-conformity from the QC and IPC department From Aerosol Production Line due to Leakage test Failure and Out of Specifications. And it was found that the blisters, vial, and ampoule physically are out of specifications as well.The major causes of nonconformities and root causes of the quality problems were specified, and possible remedies were proposed. Although the company has many constraints to implement all suggestion for improvement within short period of time, the company recognized that the suggestion will provide significant productivity improvement in the long run
530 _aIssued also as CD
653 4 _aEnhancing performance
653 4 _aPharmaceutical companies
653 4 _aPharmaceutical manufacturing company
700 0 _aEssam Ali ,
_eSupervisor
700 0 _aHegazy Zaher ,
_eSupervisor
856 _uhttp://172.23.153.220/th.pdf
905 _aNazla
_eRevisor
905 _aShimaa
_eCataloger
942 _2ddc
_cTH
999 _c83880
_d83880