000 | 012190000a22003010004500 | ||
---|---|---|---|
003 | EG-GICUC | ||
005 | 20250223032937.0 | ||
008 | 070407s2003 ua a f m 000 0 eng d | ||
040 |
_aEG-GICUC _beng _cEG-GICUC |
||
041 | 0 | _aEng | |
049 | _aDeposite | ||
097 | _aM.Sc | ||
099 | _aCai01.13.11.M.Sc.2003.An.T | ||
100 | 0 | _aAnssary Mohamed Ahmed Elfara | |
245 | 1 | 0 |
_aThermal - hydraulic performance of high - pressure test loop facility in ETRR - 2 / _cAnssary Mohamed Ahmed Elfara ; Supervised Adel Khalil Hassan Khalil |
246 | 1 | 5 | _aالاداء الهيدروليكى والحرارى لدائرة الاختبار ذات الضغط العالى بمفاعل مصر البحثى الثانى |
260 |
_aCairo : _bAnssary Mohamed Ahmed Elfara , _c2003 |
||
300 |
_a144P : _bill ; _c30cm |
||
502 | _aThesis (M.Sc.) - Cairo University - Faculty Of Engineering - Department Of Mechanical Power Engineering | ||
530 | _aIssued also as CD | ||
653 | 4 | _ahigh - pressure test loop | |
653 | 4 | _aThermal - hydraulic | |
700 | 0 |
_aAdel Khalil Hassan Khalil , _eSupervisor |
|
856 | _uhttp://172.23.153.220/th.pdf | ||
905 |
_aAml _eCataloger |
||
905 |
_aEsam _eRevisor |
||
942 |
_2ddc _cTH |
||
999 |
_c84805 _d84805 |