| 000 | 015140000a22003250004500 | ||
|---|---|---|---|
| 003 | EG-GICUC | ||
| 005 | 20250223033011.0 | ||
| 008 | 070422s2007 ua d f m 000 0 Eng d | ||
| 040 |
_aEG-GICUC _beng _cEG-GICUC |
||
| 041 | 0 | _aEng | |
| 049 | _aDeposite | ||
| 097 | _aM.Sc | ||
| 099 | _aCai01.13.05.M.Sc.2007.Mo.E | ||
| 100 | 0 | _aMohamed Moamen Mahmoud Mohamed Ibrahim | |
| 245 | 1 | 0 |
_aEstimating minimum acceptable construction claim amounts in negotiation process / _cMohamed Moamen Mahmoud Mohamed Ibrahim ; Supervised Moheeb Elsaid Ibrahim , Mohamed Mahdy Marzok |
| 246 | 1 | 5 | _aتقدير الحد الادنى لقيم مطالبات التشييد اثناء عملية التفاوض |
| 260 |
_aCairo : _bMohamed Moamen Mahmoud Mohamed Ibrahim , _c2007 |
||
| 300 |
_a128P : _bCharts ; _c30cm |
||
| 502 | _aThesis (M.Sc.) - Cairo University - Faculty Of Engineering - Department Of Civil Engineering | ||
| 520 | _aConstruction disputes could be resolved using several techniques including , negotiation , mediation , dispute resolution board , arbitration , and litigation negotiation is considered the most perferred technique due to the following facts : i) | ||
| 530 | _aIssued also as CD | ||
| 653 | 4 | _aacceptable construction | |
| 653 | 4 | _aEstimating minimum | |
| 700 | 0 |
_aMohamed Mahdy Marzok , _eSupervisor |
|
| 700 | 0 |
_aMoheeb Elsaid Ibrahim , _eSupervisor |
|
| 856 | _uhttp://172.23.153.220/th.pdf | ||
| 905 |
_aAml _eCataloger |
||
| 905 |
_aEsam _eRevisor |
||
| 942 |
_2ddc _cTH |
||
| 999 |
_c85890 _d85890 |
||