الأسس الإقتصادية لتخفيض تكلفة المبنى فى مرحلة التنفيذ / (Record no. 162648)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 05542namaa2200409 i 4500 |
003 - CONTROL NUMBER IDENTIFIER | |
control field | OSt |
005 - أخر تعامل مع التسجيلة | |
control field | 20250223033038.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 230513s2022 ua a frm 000 arand d |
040 ## - CATALOGING SOURCE | |
Original cataloguing agency | EG-GICUC |
Language of cataloging | ara |
Transcribing agency | EG-GICUC |
Modifying agency | EG-GICUC |
Description conventions | rda |
041 0# - LANGUAGE CODE | |
Language code of text/sound track or separate title | ara |
Language code of summary or abstract | ara |
Language code of sung or spoken text | eng |
049 ## - Acquisition Source | |
Acquisition Source | إيداع |
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | 624 |
092 04 - LOCALLY ASSIGNED DEWEY CALL NUMBER (OCLC) | |
Classification number | 624 |
Edition number | 21 |
097 ## - Degree | |
Degree | ماجستير |
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC) | |
Local Call Number | Cai01.13.02.M.Sc.2022.مهـ.أ. |
100 0# - MAIN ENTRY--PERSONAL NAME | |
Authority record control number or standard number | مها ممدوح محمود محرم، |
Preparation | إعداد. |
245 12 - TITLE STATEMENT | |
Title | الأسس الإقتصادية لتخفيض تكلفة المبنى فى مرحلة التنفيذ / |
Statement of responsibility, etc. | اعداد مها ممدوح محمود محرم ؛ اشراف محمد محمود عويضه . |
246 15 - VARYING FORM OF TITLE | |
Title proper/short title | The ECONOMIC PRINCIPLES TO REDUCE THE BUILDINGS COST DURING THE EXCUTION PHASE |
264 #0 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE | |
Date of production, publication, distribution, manufacture, or copyright notice | 2022. |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 180 صفحة : |
Other physical details | ايضاحيات؛ |
Dimensions | 30 cm. + |
Accompanying material | CD. |
336 ## - CONTENT TYPE | |
Source | rda content |
Content type term | text |
337 ## - MEDIA TYPE | |
Source | rdamedia |
Media type term | Unmediated |
338 ## - CARRIER TYPE | |
Source | rdacarrier |
Carrier type term | volume |
502 ## - DISSERTATION NOTE | |
Dissertation note | أطروحة (ماجستير)-جامعة القاهرة، 2022. |
504 ## - BIBLIOGRAPHY, ETC. NOTE | |
Bibliography, etc. note | ببليوجرافيا: صفحات. 148-150. |
520 ## - SUMMARY, ETC. | |
Summary, etc. | تحتل قضية زيادة تكلفة بعض المشاريع خلال مرحله التنفيذ أهمية كبيرة فى كلتا المجالين الأستثمار العقارى والمقاولات والتى تعتبر من أكبر عوامل نجاح المشروع وهو ما إستدع العمل على هذه الدراسه حيث البحث عن المسببات والعوامل التى تحقق كلا من جودة التنفيذ طبقا للوقت المحدد مع التحكم فى التكلفة، وتلعب التكلفة جزءا هاما فى كافة مراحل المشروع بدايه من مرحله التصميم مرورا بمرحله الطرح واختيار أساليب التنفيذ ونوعيه التعاقد انتهاء بمرحله التنفيذ. وتتناول الدراسة تحليل مشكلة زيادة تكلفة المشاريع خلال مرحله التنفيذ للوصول بالبحث للعوامل المؤثرة على التكلفة. |
520 ## - SUMMARY, ETC. | |
Summary, etc. | The increase in cost during the various stages of construction projects affects the continuity of the work or stops it completely for long periods, during which another increase in prices may occur that is reflected in the inflated cost of project implementation, which hinders its production. Therefore, attention should be paid to studying the various factors affecting the cost during the (implementation stage) in particular. Among these factors is (The value of money, quality, work priorities, Time considerations, the nature of the project, the choice of the architect design, the function of the building, the nature of the site and the method of contracting).<br/>The issue of the delay occurred during the construction phase of some projects and the increase in the actual cost of what was planned in advance is considered one of the most important problems facing the implementation of projects that make investors refrain from setting up their money. New projects as a natural result of the disruption of some investments placed in the existing projects in addition to the inflation of loan interests and the delay in starting the project and achieving the expected return. from the above, it becomes clear the importance of the need to study the dimensions of the problem of increasing the cost of project implementation and its various aspects and to know the different reasons that led to it during the different stages of the project.<br/>The issue of increasing the cost of some projects during the implementation phase occupies great importance in both real estate investment and contracting fields, which is one of the biggest factors for the success of the project, which led to work on this study, where the search for causes and factors that achieve both the quality of implementation according to the specified time with control over Cost This research is concerned with studying the factors that control the cost. And the cost of projects during their life stages and the elements governing these factors to bring the project to the best possible level while reducing the cost. And the cost plays an important part in all phases of the project, starting from the design phase, passing through the tendering phase, choosing the methods of construction, the type of contract, and ending with the implementation phase. The study deals with analyzing the problem of increasing the cost of projects during the implementation phase to reach by research the factors affecting the cost, develop solutions and proposals to control them through a set of pillars, formulate a set of considerations and criteria, and then come up with results and recommendations for use in improving the performance of projects in terms of cost |
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE | |
Issues CD | صدر أيضًا كقرص مدمج. |
546 ## - LANGUAGE NOTE | |
Text Language | النص بالعربية والملخص بالإنجليزية. |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | هندسة الانشاءات |
Source of heading or term | qrmak. |
653 ## - INDEX TERM--UNCONTROLLED | |
Uncontrolled term | مقاول الباطن. |
-- | تخفيض التكلفه. |
-- | اساليب الخفض. |
700 0# - ADDED ENTRY--PERSONAL NAME | |
Personal name | محمد محمود عويضه. |
Relator term | مشرف أطروحة. |
900 ## - Thesis Information | |
Grant date | 01-01-2022 |
Supervisory body | محمد محمود عويضه. |
Discussion body | طارق ابراهيم نصر الدين. |
-- | شريف صبري العطار. |
Universities | جامعة القاهرة. |
Faculties | كلية الهندسة |
Department | قسم عمارة. |
905 ## - Cataloger and Reviser Names | |
Cataloger Name | Nadia |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Koha item type | Thesis |
Source of classification or shelving scheme | Dewey Decimal Classification |
Source of classification or shelving scheme | Home library | Current library | Date acquired | Inventory number | Full call number | Barcode | Date last seen | Effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | المكتبة المركزبة الجديدة - جامعة القاهرة | قاعة الرسائل الجامعية - الدور الاول | 11.02.2024 | 29653 | Cai01.13.02.M.Sc.2022.مهـ.أ. | 01010100029653000 | 30.10.2023 | 30.10.2023 | Thesis |