MARC details
000 -LEADER |
fixed length control field |
01987cam a2200313 a 4500 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
EG-GiCUC |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
150611s2014 ua dh f m 000 0 eng d |
040 ## - CATALOGING SOURCE |
Original cataloging agency |
EG-GiCUC |
Language of cataloging |
eng |
Transcribing agency |
EG-GiCUC |
041 0# - LANGUAGE CODE |
Language code of text/sound track or separate title |
eng |
049 ## - LOCAL HOLDINGS (OCLC) |
Holding library |
Deposite |
097 ## - Thesis Degree |
Thesis Level |
M.Sc |
099 ## - LOCAL FREE-TEXT CALL NUMBER (OCLC) |
Classification number |
Cai01.13.05.M.Sc.2014.Wa.F |
100 0# - MAIN ENTRY--PERSONAL NAME |
Personal name |
Wajdi Jaber Baniya Al kubaisy |
245 10 - TITLE STATEMENT |
Title |
Framework forplanning of runway pavement operations using computer simulation / |
Statement of responsibility, etc. |
Wajdi Jaber Baniya Al kubaisy ; Supervised Mohamed Mahdy Marzouk , Ahmed Atif Rashed |
246 15 - VARYING FORM OF TITLE |
Title proper/short title |
إطــار لتخطيـط أعمال الرصف بمدارج الطائرات باستخدام أسلوب المحاكاة |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Place of publication, distribution, etc. |
Cairo : |
Name of publisher, distributor, etc. |
Wajdi Jaber Baniya Al kubaisy , |
Date of publication, distribution, etc. |
2014 |
300 ## - PHYSICAL DESCRIPTION |
Extent |
103 P. : |
Other physical details |
charts , facsimiles ; |
Dimensions |
30cm |
502 ## - DISSERTATION NOTE |
Dissertation note |
Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering |
520 ## - SUMMARY, ETC. |
Summary, etc. |
Airport construction projects are one of the infrastructure projects that require high levels of quality, accuracy, expertise and skills. This research presents a framework that aids contractors in the planning of runway construction using computer simulation. It consists of two modules; Runway simulation module and decision making module. Runway simulation module considers three types of pavements; Asphalt Construction, Concrete Construction and Asphalt with Concrete Touchdown zone Construction.Three models are considered in the developed tool to capture the different construction methods that are involved in runway projects. The decision making module is capable to selecting the best construction type using fuzzy decision-making method |
530 ## - ADDITIONAL PHYSICAL FORM AVAILABLE NOTE |
Additional physical form available note |
Issued also as CD |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Airport Runways |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Computer Simulation |
653 #4 - INDEX TERM--UNCONTROLLED |
Uncontrolled term |
Intuitionistic Fuzzy |
700 0# - ADDED ENTRY--PERSONAL NAME |
Personal name |
Ahmed Atif Rashed , |
Relator term |
|
700 0# - ADDED ENTRY--PERSONAL NAME |
Personal name |
Mohamed Mahdy Marzouk , |
Relator term |
|
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) |
Cataloger |
Nazla |
Reviser |
Revisor |
905 ## - LOCAL DATA ELEMENT E, LDE (RLIN) |
Cataloger |
Soheir |
Reviser |
Cataloger |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
Dewey Decimal Classification |
Koha item type |
Thesis |