Probabilistic models for construction projects' durations in the Middle East / Waleed Mahfouz Mohammed Ali Youssef ; Supervised Osman Mohammed Osman Ramadan
Material type:
- نماذج احتمالية لمدة تنفيذ مشروعات التشييد في الشرق الأوسط [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Copy number | Status | Barcode | |
---|---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.Ph.D.2014.Wa.P (Browse shelf(Opens below)) | Not for loan | 01010110065598000 | ||
![]() |
مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.Ph.D.2014.Wa.P (Browse shelf(Opens below)) | 65598.CD | Not for loan | 01020110065598000 |
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
Cai01.13.05.Ph.D.2014.Ta.O Optimizing surface work operations of road construction using combined simulation and genetic algorithms / | Cai01.13.05.Ph.D.2014.Ta.O Optimizing surface work operations of road construction using combined simulation and genetic algorithms / | Cai01.13.05.Ph.D.2014.Wa.P Probabilistic models for construction projects' durations in the Middle East / | Cai01.13.05.Ph.D.2014.Wa.P Probabilistic models for construction projects' durations in the Middle East / | Cai01.13.05.Ph.D.2015.Ab.V Video - based detection and tracking model for acquiring traffic data / | Cai01.13.05.Ph.D.2015.Ab.V Video - based detection and tracking model for acquiring traffic data / | Cai01.13.05.Ph.D.2015.Ah.E Estimating relative benefits of different strategies for wastewater management in Nile Delta / |
Thesis (Ph.D.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
The success of construction projects is confronted by several drastic risks. Also, the accurate estimation of activities durations constitutes a major critical concern in the time scheduling process. This study presents a comprehensive analysis of activities duration to evaluate the actual behaviour of activities exposed to different types of risk and uncertainty and to derive regression models predicting activities{u2019} durations for different cases. The results show that the best PDF to represent construction activities durations is the lognormal distribution. Besides, the ratio of the highest, actual activity duration to the corresponding mean duration is always more than 4 for projects in the Middle East, which differs from that suggested in previous studies (1.25)