Modeling construction contractor selection using fuzzy analytical hierarchy process / Ahmed Mohamed Hassan Eldeeb ; Supervised Mohamed Mahdy Marzouk , Mohamed Mohamed Galal Elbarkouky
Material type:
- نموذج لإختيار مقاولى التشييد باستخدام نظم التحليل الهيكلية الغائمة [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Copy number | Status | Barcode | |
---|---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2015.Ah.M (Browse shelf(Opens below)) | Not for loan | 01010110066155000 | ||
![]() |
مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2015.Ah.M (Browse shelf(Opens below)) | 66155.CD | Not for loan | 01020110066155000 |
Browsing المكتبة المركزبة الجديدة - جامعة القاهرة shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
Cai01.13.05.M.Sc.2015.Ah.F Fresh and hardened properties and proposed structural application of styrofoam light weight concrete / | Cai01.13.05.M.Sc.2015.Ah.L Live load distribution of precast concrete u - girder bridges / | Cai01.13.05.M.Sc.2015.Ah.L Live load distribution of precast concrete u - girder bridges / | Cai01.13.05.M.Sc.2015.Ah.M Modeling construction contractor selection using fuzzy analytical hierarchy process / | Cai01.13.05.M.Sc.2015.Ah.M Modeling construction contractor selection using fuzzy analytical hierarchy process / | Cai01.13.05.M.Sc.2015.Ah.P Punching shear behavior of ferrocement panels exposed to elevated temperature / | Cai01.13.05.M.Sc.2015.Ah.P Punching shear behavior of ferrocement panels exposed to elevated temperature / |
Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
Selection of construction contractors is the process of hiring appropriate contractor to deliver the project, considering the given constraints with respect to quality time, and cost. Selection based on a set of qualification criteria is essential to the success of construction projects since these qualification criteria screen out incapable contractors. The qualifications of the lowest bidder may not suit the selected project delivery method. Sometimes, contractors, when faced with a shortage of work, offer a low bid price to remain in business with the expectation to offset the loss through claims. Thus, bid evaluation based on the lowest bid price without considering contractors{u2019} qualifications is not suitable, especially in large-scale public projects. A common problem, however, is the capability of the selected contractor to meet the requirements of the project delivery method. This research proposes a framework that utilizes fuzzy logic to identify, categorize, and determine the relevance of contractor{u2019}s selection factors
Issued also as CD
There are no comments on this title.