header
Local cover image
Local cover image
Image from OpenLibrary

Modeling construction contractor selection using fuzzy analytical hierarchy process / Ahmed Mohamed Hassan Eldeeb ; Supervised Mohamed Mahdy Marzouk , Mohamed Mohamed Galal Elbarkouky

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Ahmed Mohamed Hassan Eldeeb , 2015Description: 110 P. : plans ; 30cmOther title:
  • نموذج لإختيار مقاولى التشييد باستخدام نظم التحليل الهيكلية الغائمة [Added title page title]
Subject(s): Online resources: Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: Selection of construction contractors is the process of hiring appropriate contractor to deliver the project, considering the given constraints with respect to quality time, and cost. Selection based on a set of qualification criteria is essential to the success of construction projects since these qualification criteria screen out incapable contractors. The qualifications of the lowest bidder may not suit the selected project delivery method. Sometimes, contractors, when faced with a shortage of work, offer a low bid price to remain in business with the expectation to offset the loss through claims. Thus, bid evaluation based on the lowest bid price without considering contractors{u2019} qualifications is not suitable, especially in large-scale public projects. A common problem, however, is the capability of the selected contractor to meet the requirements of the project delivery method. This research proposes a framework that utilizes fuzzy logic to identify, categorize, and determine the relevance of contractor{u2019}s selection factors
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2015.Ah.M (Browse shelf(Opens below)) Not for loan 01010110066155000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2015.Ah.M (Browse shelf(Opens below)) 66155.CD Not for loan 01020110066155000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

Selection of construction contractors is the process of hiring appropriate contractor to deliver the project, considering the given constraints with respect to quality time, and cost. Selection based on a set of qualification criteria is essential to the success of construction projects since these qualification criteria screen out incapable contractors. The qualifications of the lowest bidder may not suit the selected project delivery method. Sometimes, contractors, when faced with a shortage of work, offer a low bid price to remain in business with the expectation to offset the loss through claims. Thus, bid evaluation based on the lowest bid price without considering contractors{u2019} qualifications is not suitable, especially in large-scale public projects. A common problem, however, is the capability of the selected contractor to meet the requirements of the project delivery method. This research proposes a framework that utilizes fuzzy logic to identify, categorize, and determine the relevance of contractor{u2019}s selection factors

Issued also as CD

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image