Cost contingency estimation for highway constuction projects in Egypt / Hani Samir Soliman Ghattas ; Supervised Moheeb Elsaid Ibrahem , Ahmed Saad Eldin Mohamed

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Hani Samir Soliman Ghattas , 2018Description: 85 , 100 P. ; 30cmOther title:
  • تقدير تكلفة الطوارئ لمشاريع تشييد الطرق السريعة فى مصر [Added title page title]
Subject(s): Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: The problem arose because the groups responsible for the cost estimation lack a definition of contingency and its estimating techniques, and this causes problems of increasing the cost of the project. Cost control problems due to error and inaccuracy of the basic cost estimate. This paper reviewed the previous research related to estimating the cost of emergency projects for the construction of the Egyptian highways, taking into account the main factors affecting the highway projects. The study produced a set of values for contingency reserves as percentage of the estimated budget distributed to various project sites, contract types and project components for use as reference when estimating emergency reserves. Risk reserves are calculated on the basis of calculating the probability of risk and its impact on the risk profile
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Date due Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2018.Ha.C (Browse shelf(Opens below)) Not for loan 01010110076026000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2018.Ha.C (Browse shelf(Opens below)) 76026.CD Not for loan 01020110076026000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

The problem arose because the groups responsible for the cost estimation lack a definition of contingency and its estimating techniques, and this causes problems of increasing the cost of the project. Cost control problems due to error and inaccuracy of the basic cost estimate. This paper reviewed the previous research related to estimating the cost of emergency projects for the construction of the Egyptian highways, taking into account the main factors affecting the highway projects. The study produced a set of values for contingency reserves as percentage of the estimated budget distributed to various project sites, contract types and project components for use as reference when estimating emergency reserves. Risk reserves are calculated on the basis of calculating the probability of risk and its impact on the risk profile