Causes of claims due to changes in time schedules of construction projects in Iraq / Buroog Basheer Mahmood ; Supervised Moheeb Elsaid Ibrahim , Ahmed Mohamed Eldokhmasey

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Buroog Basheer Mahmood , 2012Description: 106 P. : charts ; 30cmOther title:
  • أسباب المطالبات الناجمة عن التغيرات في الجداول الزمنية في مشاريع التشييد فى العراق [Added title page title]
Subject(s): Online resources: Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: This research aims to identify the factors affecting the time schedule of construction projects, based on a number of axes that are usually faced during the different stages of the project; starting from design, execution, supervision, and follow-up stages, in addition to the project management axis. The main purpose is avoiding the negative paths and preventing deviations that cause project delay than the due time, and all other factors affecting the schedule whether speeding up or decelerating the project, and thus avoiding the resulting claims
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2012.Bu.C (Browse shelf(Opens below)) Not for loan 01010110060054000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2012.Bu.C (Browse shelf(Opens below)) 60054.CD Not for loan 01020110060054000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

This research aims to identify the factors affecting the time schedule of construction projects, based on a number of axes that are usually faced during the different stages of the project; starting from design, execution, supervision, and follow-up stages, in addition to the project management axis. The main purpose is avoiding the negative paths and preventing deviations that cause project delay than the due time, and all other factors affecting the schedule whether speeding up or decelerating the project, and thus avoiding the resulting claims

Issued also as CD