Critical factors effecting on delay time in residential construction projects / Dalia Ahmed Elbadawy Mahmoud Kshaf ; Supervised Moheeb Elsaid Ibrahim , Saeed Ahmed Alsheikh
Material type:
- العوامل الحرجة التي تؤثر على التأخير في المشاريع السكنية [Added title page title]
- Issued also as CD
Item type | Current library | Home library | Call number | Copy number | Status | Barcode | |
---|---|---|---|---|---|---|---|
![]() |
قاعة الرسائل الجامعية - الدور الاول | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2018.Da.C (Browse shelf(Opens below)) | Not for loan | 01010110075425000 | ||
![]() |
مخـــزن الرســائل الجـــامعية - البدروم | المكتبة المركزبة الجديدة - جامعة القاهرة | Cai01.13.05.M.Sc.2018.Da.C (Browse shelf(Opens below)) | 75425.CD | Not for loan | 01020110075425000 |
Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering
Time is considered one of the most powerful factors that leads to the success of any projects, sometimes leads to legal disputes between parties. Therefore, it is essential to study and analyze causes of construction delay to determine the party which is responsible for the delay or if the reasons are beyond the control of any of the parties.This research presents a list of the most important construction delay causes according to interviews. Statistical analysis is carried out using analysis of variance (Kruskal-wallis) method to test delay causes, obtained from interviews. In the end a road map that includes the reasons for the delay, according to their importance and proposals of the parties ( The owner {u2013} The contractor {u2013} The consultant ) were made to avoid delays in the project , or at least to reduce them
Issued also as CD
There are no comments on this title.