header
Local cover image
Local cover image
Image from OpenLibrary

Developing new approach for measuring construction project performance / Khaled Aboulata Mohamed Aboulata ; Supervised Moheeb Elsaid Ibrahim , Ahmed Saad

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Cairo : Khaled Aboulata Mohamed Aboulata , 2016Description: 119 P. : facsimiles ; 30cmOther title:
  • تطوير طريقة جديدة لقياس الأداء فى مشروعات التشييد [Added title page title]
Subject(s): Online resources: Available additional physical forms:
  • Issued also as CD
Dissertation note: Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering Summary: This research discussed six different approaches used for measuring performance of construction projects to illustrate differences between approaches through detailed study of each approach objective, theory, advantages and limitations. Also, a practical example was provided to apply each approach on real project. Finally, research recommended a new approach which may be used to evaluate the current performance, identify the opportunity for necessary improvement and estimate future performance with its probability of occurrence
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Copy number Status Barcode
Thesis Thesis قاعة الرسائل الجامعية - الدور الاول المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2016.Kh.D (Browse shelf(Opens below)) Not for loan 01010110071775000
CD - Rom CD - Rom مخـــزن الرســائل الجـــامعية - البدروم المكتبة المركزبة الجديدة - جامعة القاهرة Cai01.13.05.M.Sc.2016.Kh.D (Browse shelf(Opens below)) 71775.CD Not for loan 01020110071775000

Thesis (M.Sc.) - Cairo University - Faculty of Engineering - Department of Civil Engineering

This research discussed six different approaches used for measuring performance of construction projects to illustrate differences between approaches through detailed study of each approach objective, theory, advantages and limitations. Also, a practical example was provided to apply each approach on real project. Finally, research recommended a new approach which may be used to evaluate the current performance, identify the opportunity for necessary improvement and estimate future performance with its probability of occurrence

Issued also as CD

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image